Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia region - STPASA - 24/08/2016
AEMO declares a Forecast LOR1 condition for the South Australia region for the following period:
From 24/08/2016 1830 hrs to 2000 hrs
The contingency capacity reserve required is 400 MW.
The minimum reserve available is 361 MW.
Harmohan Singh
Operations Planning
Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA - 23 July 2016
Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA - 23 July 2016.
The Forecast LOR1 condition in the SA Region advised in AEMO Electricity Market Notice No.54573 is cancelled at 1400 hrs on 22 July 2016.
LOR conditions are no longer forecast in the STPASA period.
Harmohan Singh
Operations Planning
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia region - STPASA - 23/07/2016
AEMO declares a Forecast LOR1 condition for the South Australia region for the following period:
From 23/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 400 MW.
The minimum reserve available is 273 MW.
Bhishma Chhetri
Operations Planning
Cancellation of the Forecast (LOR1) condition in the SA region - STPASA - 20 to 21 July 2016
Cancellation of the Forecast (LOR1) condition in the South Australia region - STPASA - 20 to 21 July 2016.
The Forecast LOR1 condition in the SA Region advised in AEMO Electricity Market Notice No.54541 is cancelled at 1400 hrs on 19 July 2016.
LOR conditions are no longer forecast in the STPASA period.
Harmohan Singh
Operations Planning
Update of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA - 20 to 21 July 2016
RE: AEMO Electricity market Notice No. 54534
NOTICE OF UPDATE
AEMO declares a Forecast LOR1 condition for the South Australia region for the following period:
From 20/07/2016 1000 hrs to 21/07/2016 0400 hrs
The contingency reserve required is 440 MW
The minimum reserve available is 240 MW.
Bhishma Chhetri
Operations Planning
Update of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA - 19 -21/07/2016
The Forecast LOR1 condition in the South Australia region advised in AEMO Electricity Market Notice No. 54521 has been updated at 1400hrs 17/07/2016 to the following:
1. From 19/07/2016 1530 hrs to 20/07/2016 0400 hrs
The minimum reserve available is 240 MW.
2. From 20/07/2016 1230 hrs to 21/07/2016 0430 hrs
The minimum reserve available is 240 MW.
The contingency capacity reserve required over the above periods of forecast LOR1 conditions is 440 MW.
Manager NEM Real Time Operations
Update of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA - 19 -21/07/2016
The Forecast LOR1 condition in the South Australia region advised in AEMO Electricity Market Notice No. 54513 has been updated at 1400hrs 16/07/2016 to the following:
1. From 19/07/2016 1500 hrs to 20/07/2016 0400 hrs
The minimum reserve available is 240 MW.
2. From 20/07/2016 1400 hrs to 21/07/2016 0400 hrs
The minimum reserve available is 240 MW.
The contingency capacity reserve required over the above periods of forecast LOR1 conditions is 440 MW.
Manager NEM Real Time Operations
Cancellation of the Forecast (LOR1) condition in the SA region - PDPASA - 16 July 2016
Cancellation of the Forecast (LOR1) condition in the SA region - PDPASA - 16 July 2016
The Forecast LOR1 condition in the SA Region advised in AEMO Electricity Market Notice No.54512 is cancelled at 1610 hrs 15 July 2016.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australia region - STPASA - 19-21/07/2016
AEMO declares a Forecast LOR1 condition for the South Australia region for the following periods:
1. From 19/07/2016 1500 hrs to 20/07/2016 0400 hrs
The minimum reserve available is 240 MW.
2. From 20/07/2016 1800 hrs to 21/07/2016 0400 hrs
The minimum reserve available is 380 MW.
The contingency capacity reserve required over the above periods of forecast LOR1 conditions is 440 MW.
Bhishma Chhetri
Operations Planning