STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 20/05/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 0600 hrs to 0730 hrs 20/05/2024.
The forecast capacity reserve requirement is 1126 MW.
The minimum capacity reserve available is 1121 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
[EventId:202405150700_review] Prices for interval 15-May-2024 07:00 are subject to review
Issued by Australian Energy Market Operator Ltd at 0655 hrs on 15 May 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 15-May-2024 07:00.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202405150655_review] Prices for interval 15-May-2024 06:55 are subject to review
Issued by Australian Energy Market Operator Ltd at 0650 hrs on 15 May 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 15-May-2024 06:55.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202405150650_review] Prices for interval 15-May-2024 06:50 are subject to review
Issued by Australian Energy Market Operator Ltd at 0645 hrs on 15 May 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 15-May-2024 06:50.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202405150645_review] Prices for interval 15-May-2024 06:45 are subject to review
Issued by Australian Energy Market Operator Ltd at 0640 hrs on 15 May 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 15-May-2024 06:45.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202405150640_review] Prices for interval 15-May-2024 06:40 are subject to review
Issued by Australian Energy Market Operator Ltd at 0635 hrs on 15 May 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 15-May-2024 06:40.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202405150635_review] Prices for interval 15-May-2024 06:35 are subject to review
Issued by Australian Energy Market Operator Ltd at 0630 hrs on 15 May 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 15-May-2024 06:35.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal condition - NEM regions.
AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 116572 is no longer reasonably possible and accordingly its classification has reverted to non-credible.
Cancellation time: 1115 hrs 13/05/2024.
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Cancellation time: 12/05/2024 10:54
Constraint set(s) revoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Refer AEMO Electricity Market Notice 116593
Auto-generated on behalf of Manager NEM Real Time Operations