57241RESERVE NOTICE06/02/2017 04:50:01 PM

Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.

AEMO ELECTRICITY MARKET NOTICE

Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.

Refer AEMO Electricity market notice 57238

An Actual LOR1 condition has been declared for the NSW Region.

From 1330 hrs to 1730 hrs Monday, 6 February 2017

The contingency capacity reserve required is 1340 MW

The minimum reserve available is 768 MW


Manager NEM Real Time Operations

57238RESERVE NOTICE06/02/2017 01:46:45 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.

An Actual LOR1 condition has been declared for the NSW Region.

From 1330 hrs to 1700 hrs Monday, 6 February 2017

The contingency capacity reserve required is 1330 MW

The minimum reserve available is 1010 MW


Manager NEM Real Time Operations


56661RESERVE NOTICE06/01/2017 05:44:39 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 6/1/17

AEMO ELECTRICITY MARKET NOTICE
Correction to Market notice 56660 - should be type Market notice type Reserve Notice.

Cancellation of Actual (LOR1) condition in the South Australia region - 6/1/17
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No.56660 is cancelled at 1745 hrs 6/1/17.

Manager NEM Real Time Operations
54508RESERVE NOTICE14/07/2016 08:33:32 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16

AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 54507 is cancelled at 2030 hrs 14/07/16

Manager NEM Real Time Operations
54507RESERVE NOTICE14/07/2016 05:46:03 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16.

An Actual LOR1 condition has been declared for the SA Region from 1745 hrs.

The Actual LOR1 condition is forecast to exist until 2030 hrs

The contingency capacity reserve required is 440 MW

The minimum reserve available is 342 MW


Manager NEM Real Time Operations
54480RESERVE NOTICE13/07/2016 09:09:28 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16

AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 544785 is cancelled at 2100 hrs 13/07/16

Manager NEM Real Time Operations
54478RESERVE NOTICE13/07/2016 06:04:37 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16.

An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 2100 hrs

The contingency capacity reserve required is 400 MW

The minimum reserve available is 281 MW


Manager NEM Real Time Operations
54460RESERVE NOTICE12/07/2016 07:44:57 PM

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

Manager NEM Real Time Operations

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No 54458 is cancelled at 1930 hrs Tuesday, 12 July 2016.


Manager NEM Real Time Operations

54458RESERVE NOTICE12/07/2016 07:04:33 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

An Actual LOR1 condition has been declared for the South Australia Region.

From 1830 hrs to 1930 hrs Tuesday, 12 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 224 MW


Manager NEM Real Time Operations