95690CONSTRAINTS01/04/2022 09:00:20 AM

Update to Vic to NSW transient stability limit

AEMO ELECTRICITY MARKET NOTICE

AEMO has completed a comprehensive review of the system normal transient stability limit for loss of a Hazelwood to South Morang 500 kV line for flows from Victoria to New South Wales. The revised limit takes into account a larger range of inertias, demands, interconnector flows and many different plants online. The revised limit is generally lower than the existing limit due to lower demands and inertias in the Victorian system since the last review back in 2016. However, it is expected the revised limit will normally be under-cut by the Victorian export voltage collapse limit for loss of all APD potlines.

The revised constraint equation includes generators in southern NSW and generation in Victoria on the left-hand side as well as interconnectors. Full details on the limits advice are to be published on 04/04/2022 on the AEMO website: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This revised limit will be implemented to the Victorian system normal constraint set V-NIL at 1000 hrs Tuesday 5th April 2022, with the following changes:

Constraint equations to remove:
- V::N_NIL_V
- V::N_NIL_S
- V::N_NIL_Q1
- V::N_NIL_Q2
Constraint equations to add:
- V::N_NIL_V1
- V::N_NIL_V2
- V::N_NIL_O1
- V::N_NIL_O2

These constraint equation changes have already been applied in AEMO's PreProduction systems.

For further details on the constraint equations please contact terry.liu@aemo.com.au

Terry Liu
AEMO Operations
94226RECALL GEN CAPACITY30/01/2022 06:50:14 PM

Request for Generator Recall Information for the period for 02/02/2022 for OLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 94225

Please provide Generator Recall Information for 02/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
94211RECALL GEN CAPACITY30/01/2022 11:15:30 AM

Update - Request for Generator Recall Information for the period for 01/02/2022 for QLD Region

AEMO ELECTRICITY MARKET NOTICE

Correction to external reference in AEMO Electricity Market Notice 94209. It should read Qld.

Refer to AEMO Electricity Market Notice 94205

Please provide Generator Recall Information for 01/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
94210RECALL GEN CAPACITY30/01/2022 10:54:33 AM

Request for Generator Recall Information for the period for 01/02/2022 for NSW Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 94208

Please provide Generator Recall Information for 01/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
94209RECALL GEN CAPACITY30/01/2022 10:53:37 AM

Request for Generator Recall Information for the period for 01/02/2022 for OLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 94205

Please provide Generator Recall Information for 01/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
94207RECALL GEN CAPACITY30/01/2022 08:57:36 AM

Cancellation of the Request for Generator Recall Information for 02/02/2022 for QLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer the AEMO Electricity Market Notice No.94190

Capacity reserves in QLD region for 02/02/2022 have increased and the LOR2 condition no longer exists for this day.

Hence AEMO withdraws the request for provding Generator Recall Information for QLD region for 02/02/2022.


Manager NEM Real Time Operations
94190RECALL GEN CAPACITY29/01/2022 05:50:05 PM

Request for Generator Recall Information for the period for 02/02/2022 for OLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 94189

Please provide Generator Recall Information for 02/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
94175RECALL GEN CAPACITY29/01/2022 09:43:03 AM

Cancellation of the Request for Generator Recall Information for 02/02/2022 for QLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer the AEMO Electricity Market Notice No.94080

Capacity reserves in QLD region for 02/02/2022 have increased and the LOR2 condition no longer exists for this day.

Hence AEMO withdraws the request for provding Generator Recall Information for QLD region for 02/02/2022.


Manager NEM Real Time Operations
94135RECALL GEN CAPACITY28/01/2022 01:06:33 PM

Cancellation of the Request for Generator Recall Information for 01/02/2022 for QLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer the AEMO Electricity Market Notice No.94079.

Capacity reserves in QLD region for 01/02/2022 have increased and the LOR2 condition no longer exists for this day.

Hence AEMO withdraws the request for provding Generator Recall Information for QLD region for 01/02/2022.

Generator Recall Information for 02/02/2022 for QLD region must be submitted, refer the market notice Nos.94080 and 94133.

AEMO Operations