111287RESERVE NOTICE14/11/2023 05:07:19 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 14/11/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 14/11/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1630 hrs.

The Actual LOR1 condition is forecast to exist until 1700 hrs.

The forecast capacity reserve requirement is 1415 MW.
The minimum capacity reserve available is 1376 MW.

Manager NEM Real Time Operations
111156RESERVE NOTICE12/11/2023 07:25:20 PM

Cancellation of Actual (LOR1) condition in the NSW region - 12/11/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 12/11/2023

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.111155 is cancelled at 1920 hrs 12/11/2023.

Manager NEM Real Time Operations
111155RESERVE NOTICE12/11/2023 06:00:23 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 12/11/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 12/11/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1830 hrs.

The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1357 MW.


Manager NEM Real Time Operations
110931RESERVE NOTICE08/11/2023 06:33:57 PM

Cancellation of Actual (LOR1) condition in the NSW region - 08/11/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 08/11/2023

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.110927 is cancelled at 1825 hrs 08/11/2023.

Manager NEM Real Time Operations
110927RESERVE NOTICE08/11/2023 05:54:14 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 08/11/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 08/11/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is not forecast in Pre Dispatch

The capacity reserve requirement is 1558 MW
The minimum capacity reserve available is 1524 MW

Manager NEM Real Time Operations
110678CONSTRAINTS02/11/2023 12:08:31 PM

Updated Victorian system normal voltage oscillation limit

AEMO ELECTRICITY MARKET NOTICE

AEMO has completed a comprehensive review on voltage oscillation issue in south-west Victoria with consideration of wider asynchronous generators in the area. The voltage oscillation occurs in the south-west region when Heywood interconnector flow is higher than 500 MW from South Australia to Victoria.

The limit will manage the total MW output from Stockyard Hill, Dundonnell and Macarthur wind farms during period when flow on Heywood interconnector higher than 500 MW towards Victoria.

The new constraint equation includes asynchronous generators in south-west Victoria on the left-hand side. This limit is to replace the existing south-west Victoria voltage oscillation limit. Full details on the limits advice are to be published shortly on the AEMO website: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

The following changes will be implemented at 1000 hrs on Friday 3rd November 2023
? Constraint equation will be removed from constraint set V-NIL:
V_SHWF_FLT_286

? Constraint equation will be implemented and added to constraint set V-NIL:
V_SH_DD_MAC_FLT_965

For full details on the formulation, the new constraint equation has now been loaded into AEMO's pre-production systems.

For further details on this change please contact terry.liu@aemo.com.au

Terry Liu
AEMO Operations
110677CONSTRAINTS02/11/2023 10:53:49 AM

Update to voltage stability and system strength constraints in North Queensland

AEMO ELECTRICITY MARKET NOTICE


Refer to market notice 102074


AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of new feeder 8905 (H13 Ross - H39 Woree) 275kV line in Far North Queensland, the system normal equations for system strength and voltage stability have been revised.

A revision to the constraint equations will be implemented at 1400 hrs on Thursday 2nd November 2023.

The new system strength combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This advice contains all the combinations for Queensland for system normal cases.

The constraint equations in the Q-NIL set below will be modified:

? Q_NIL_STRGTH_KBWF
? Q_NIL_STRGTH_KBWF
? Replace Q^NIL_FNQ_MEWF and Q^NIL_FNQ_WRSVC with new equation Q^NIL_FNQ_8905

AEMO Operations
110561RESERVE NOTICE27/10/2023 09:53:01 PM

Cancellation of Actual (LOR1) condition in the SA region - 27/10/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 27/10/2023

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.110558 is cancelled at 2130 hrs 27/10/2023.

Manager NEM Real Time Operations
110558RESERVE NOTICE27/10/2023 07:18:44 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 27/10/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 27/10/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1900 hrs.
The Actual LOR1 condition is forecast to exist until 2030 hrs

The capacity reserve requirement is 654 MW
The minimum capacity reserve available is 513 MW