Market Notices

56565RESERVE NOTICE01/01/2017 03:42:56 PM

Cancellation - Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017

Refer to MN 56554

AEMO cancels the Forecast LOR2 condition for the SA region.

From 1630 hrs to 1700 hrs 06/01/2017


Manager NEM Real Time Operations
56554RESERVE NOTICE01/01/2017 01:02:58 AM

Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017

AEMO declares a Forecast LOR2 condition for the SA region.
From 1630 hrs to 1700 hrs 06/01/2017
The contingency capacity reserve required is 200 MW
The minimum reserve available is 195 MW

AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.


Manager NEM Real Time Operations
56398RESERVE NOTICE22/12/2016 02:36:34 PM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia region - 23/12/16

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 56397

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0700 hrs to 1330 hrs on 23/12/2016.

AEMO declares a Forecast LOR2 condition for the South Australia region during the short notice outage of the Moorabool - Mortlake PS 500 kV Line in Victoria region, from 0700 hrs to 1330 hrs 23/12/16.

On the occurrence of a credible contingency during this planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Manager NEM Real Time Operations

56380RESERVE NOTICE21/12/2016 04:09:02 PM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia region - 22/12/16


AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 56379

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0600 hrs to 1530 hrs on 22/12/2016.

AEMO declares a Forecast LOR2 condition for the South Australia region during the planned outage of Heywood - Tarrone PS 500k V line in Victoria region, from 0600 hrs to 1530 hrs 22/12/2016.

On the occurrence of a credible contingency during this planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Manager NEM Real Time Operations
56225RESERVE NOTICE09/12/2016 09:31:53 AM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia region - 14 to 15 Dec 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notice 55727

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0600 hrs on 14/12/2016 to 1600 hrs on 15/12/2016.

AEMO declares Forecast LOR2 conditions for the South Australia region during the planned outage of Heywood No.1 500 kV busbar in Victoria region, from 0600 hrs on 14/12/2016 to 1600 hrs on 15/12/2016.

On the occurrence of a credible contingency during this planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Harmohan Singh
Operations Planning
55867RESERVE NOTICE28/11/2016 01:43:08 PM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - 30 Nov to 01 Dec 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notice 55515

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0600 hrs on 30/11/2016 to 1600 hrs on 01/12/2016.

AEMO declares Forecast LOR2 conditions for the South Australia region during the planned outage of Heywood No.2 500 kV busbar from 0600 hrs on 30/11/2016 to 1600 hrs on 01/12/2016.

On the occurrence of a credible contingency during these planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Operations Planning
Bhishma Chhetri
55749RESERVE NOTICE16/11/2016 12:46:43 PM

Forecast Lack of Reserve Level 2 (LOR2) in South Australia from 22 Nov 2016 to 26 Nov 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notices: 55466.

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region starting from 0700hrs 22/11/2016 to 1700hrs 26/11/2016.

AEMO declares Forecast LOR2 conditions in the South Australia region for the above period. During this period, an outage is scheduled for Heywood to South East No.1 275 kV transmission line between Victoria and South Australia.

On the occurrence of a credible contingency during this outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supply in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Catherine Wu
AEMO Operations
55573RESERVE NOTICE07/11/2016 01:22:04 PM

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - 8 to 9 Nov 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notice 55368

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0600 hrs on 08/11/2016 to 1600 hrs on 09/11/2016.

AEMO declares Forecast LOR2 conditions for the South Australia region during the planned outages in Victoria detailed below:
[1] Heywood No.2 500 kV busbar from 0600 hrs on 08/11/2016 to 1600 hrs on 09/11/2016.
[2] Heywood to Mortlake 500 kV transmission line from 0600 hrs to 1600 hrs daily on 08/11/2016 and 09/11/2016.

On the occurrence of a credible contingency during these planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Operations Planning
Harmohan Singh
55389RESERVE NOTICE14/10/2016 02:51:42 PM

Forecast Lack of Reserve Level 2 (LOR2) in South Australia from 18 Oct 2016 to 22 Oct 2016

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Market Notices: 55353 and 54934.

Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region starting from 0700hrs 18/10/2016 to 1700hrs 22/10/2016.

AEMO declares Forecast LOR2 conditions in the South Australia region for the above period. During this period, an outage is scheduled for Heywood to South East No.2 275 kV transmission line between Victoria and South Australia.

On the occurrence of a credible contingency during this outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supply in South Australia.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.

Kin Onn Wong