Market Notices

58492RESERVE NOTICE05/05/2017 12:46:13 PM

STPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the Victoria Region on 10 and 11 May 2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the Vic region advised in AEMO Electricity Market Notice No. 58480 has been updated at 1000 hrs 05/05/2017 to the following:

1. From 1730 hrs to 1930 hrs on 10/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 496 MW.

2. From 0700 hrs to 1730 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 0 MW.

3. From 1800 hrs to 2030 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 100 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58480RESERVE NOTICE04/05/2017 05:06:02 PM

STPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the Victoria Region on 10 and 11 May 2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the Vic region advised in AEMO Electricity Market Notice No. 58475 has been updated at 1600 hrs 04/05/2017 to the following:

1. From 1730 hrs to 1900 hrs on 10/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 519 MW.

2. From 0700 hrs to 1030 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 311 MW.

3. From 1330 hrs to 2030 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 0 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58479RESERVE NOTICE04/05/2017 05:05:45 PM

STPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the SA Region on 11/05/2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 58476 has been updated at 1600 hrs 04/05/2017 to the following:

1. From 0800 hrs to 0830 hrs on 11/05/2017.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 311 MW.

2. From 1730 hrs to 1800 hrs on 11/05/2017.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 2 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58476RESERVE NOTICE04/05/2017 03:18:15 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 11/05/2017

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the SA region for the following period:

From 1730 hrs to 1800 hrs on 11/05/2017.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 111 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58475RESERVE NOTICE04/05/2017 03:17:58 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the Victoria Region on 10 and 11 May 2017

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the VIC region for the following periods:

1. From 1730 hrs to 1900 hrs on 10/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 506 MW.

2. From 0700 hrs to 1030 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 357 MW.

3. From 1400 hrs to 1600 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 512 MW.

4. From 1630 hrs to 2000 hrs on 11/05/2017.
The contingency capacity reserve required is 594 MW.
The minimum reserve available is 0 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Daniel Ghantous
AEMO Operations
58382RESERVE NOTICE13/04/2017 12:13:55 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia Region on 18/04/2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 58381 is cancelled at 1200 hrs 13/04/2017.

No LOR2 condition is currently forecast in the STPASA period.

Daniel Ghantous
AEMO Operations
58381RESERVE NOTICE13/04/2017 10:51:27 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia Region on 18/04/2017

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the South Australia region for the following period:

From 1800 hrs to 1930 hrs on 18/04/2017.
The contingency capacity reserve required is 220 MW.
The minimum reserve available is 191 MW.

Daniel Ghantous
AEMO Operations
58380RESERVE NOTICE13/04/2017 04:26:00 AM

Cancellation: STPASA Forecast Lack Of Reserve Level 2 (LOR2) in SA Region 18/04/2017

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region for 18/04/2017 advised in AEMO Electricity Market Notice No. 58378 is cancelled at 0400 hrs 13/04/2017.

Manager NEM Real Time Operations
58378RESERVE NOTICE13/04/2017 12:58:44 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia Region on 18/04/2017

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the SA region for the following period:

From 1830 hrs to 1900 hrs on 18/04/2017.
The contingency capacity reserve required is 220 MW.
The minimum reserve available is 213 MW.

AEMO is seeking a market response.

AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm