Cancellation of Actual (LOR1) condition in the NSW region - 20/06/2023
Cancellation of Actual (LOR1) condition in the NSW region - 20/06/2023
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No. 108640 is cancelled at 1940 hrs.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 20/06/2023
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 20/06/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs.
The forecast capacity reserve requirement is 1631 MW.
The minimum capacity reserve available is 1564 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 30/05/2023
Cancellation of Actual (LOR1) condition in the NSW region - 30/05/2023
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice 108287 is cancelled at 1945 hrs 30/05/2023
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the QLD region - 30/05/2023
Cancellation of Actual (LOR1) condition in the QLD region - 30/05/2023
The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice 108286 is cancelled at 1815 hrs 30/05/2023
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/05/2023
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 30/05/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1151 MW.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 30/05/2023
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 30/05/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs.
The forecast capacity reserve requirement is 991 MW.
The minimum capacity reserve available is 922 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 27/05/2023
Cancellation of Actual (LOR1) condition in the NSW region - 27/05/2023
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice 108231 is cancelled at 1815 hrs 27/05/2023
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 27/05/2023
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 27/05/2023
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1173 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 26/05/2023
Cancellation of Actual (LOR1) condition in the NSW region - 26/05/2023
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice 108197 is cancelled at 1945 hrs 26/05/2023
Manager NEM Real Time Operations