Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 27/10/2023
Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 27/10/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1930 hrs.
The Actual LOR2 condition is not forecast in Pre Dispatch
The capacity reserve required is 480 MW
The minimum reserve available is 465 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.
Manager NEM Real Time Operations
Update - PDPASA - Cancellation of the Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/05/2023
The Actual LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 108160 is cancelled at 2045 hrs 25/05/2023.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/05/2023
The Actual LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 108160 is cancelled at 2145 hrs 25/05/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/05/2023
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 25/05/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 2000 hrs.
The Actual LOR2 condition is forecast to exist until 2030 hrs.
The forecast capacity reserve requirement is 851 MW.
The minimum capacity reserve available is 767 MW.
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement an AEMO intervention event.
Manager NEM Real Time Operations
[EventId:202304221620_confirmed] Prices for interval 22-Apr-2023 16:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1451 hrs on 24 April 2023
PRICES ARE NOW CONFIRMED for trading interval 22-Apr-2023 16:20.
In accordance with Market Notice
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
SA1 $92.11 $45.06
VIC1 $94.42 $44.94
LOWER5MIN
VIC1 $0.39 $2.38
LOWER60SEC
VIC1 $0.38 $4.24
LOWER6SEC
VIC1 $0.38 $0.53
LOWERREG
VIC1 $25.13 $13.67
RAISE5MIN
VIC1 $0.39 $0.37
RAISE60SEC
VIC1 $2.25 $1.00
RAISE6SEC
VIC1 $2.96 $1.28
RAISEREG
VIC1 $60.00 $33.61
This is an AEMO autogenerated Market Notice.
[EventId:202303172015_confirmed] Prices for interval 17-Mar-2023 20:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1145 hrs on 20 March 2023
PRICES ARE NOW CONFIRMED for trading interval 17-Mar-2023 20:15.
In accordance with Market Notice
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
NSW1 $254.92 $119.81
QLD1 $270.00 $128.22
VIC1 $222.69 $113.45
LOWER5MIN
NSW1 $0.39 $0.50
LOWER60SEC
NSW1 $0.39 $0.80
LOWER6SEC
NSW1 $0.19 $0.38
LOWERREG
NSW1 $3.98 $4.14
RAISE5MIN
NSW1 $0.69 $0.62
RAISE60SEC
NSW1 $39.00 $2.36
RAISE6SEC
NSW1 $127.88 $4.90
RAISEREG
NSW1 $167.27 $14.74
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR2) condition in the NSW region - 16/03/2023
Cancellation of Actual (LOR2) condition in the NSW region - 16/03/2023
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.106716 is cancelled at 1855hrs 16/03/2023
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the QLD region - 16/03/2023
Cancellation of Actual (LOR2) condition in the QLD region - 16/03/2023
The Actual LOR2 Condition in the QLD Region advised in AEMO Electricity Market Notice No.106719 is cancelled at 1855hrs 16/03/2023
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 16/03/2023
Actual Lack Of Reserve Level 2 (LOR2) in the QLD region - 16/03/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs.
The forecast capacity reserve requirement is 560 MW.
The minimum capacity reserve available is 531 MW.
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement an AEMO intervention event.
Manager NEM Real Time Operations