Market Notices

60363RESERVE NOTICE14/12/2017 04:37:59 PM

Cancellation of Actual (LOR1) condition in the NSW region - 14/12/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 14/12/2017

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No 60362 is cancelled at 1635 hrs 14/12/2017.


Manager NEM Real Time Operations
60362RESERVE NOTICE14/12/2017 04:07:29 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.- 14/12/2017

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.- 14/12/2017

An Actual LOR1 condition has been declared for the NSW Region from 1605 hrs.

The Actual LOR1 condition is forecast to exist until 1630 hrs
The contingency capacity reserve required is 1340 MW

The minimum reserve available is 1307 MW


Manager NEM Real Time Operations
60097RESERVE NOTICE29/11/2017 05:49:08 PM

Cancellation of Actual (LOR1) condition in the Vic region - 29/11/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the Vic region - 29/11/2017

The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.60096 is cancelled at 1740 hrs 29/11/2017.

Manager NEM Real Time Operations
60096RESERVE NOTICE29/11/2017 04:55:05 PM

Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 29/11/2017

AEMO ELECTRICITY MARKET NOTICE

An Actual LOR1 condition has been declared for the Vic Region from 1645 hrs 29/11/2017.

The Actual LOR1 condition is forecast to exist until 1730 hrs.

The contingency capacity reserve required is 1154 MW

The minimum reserve available is 1109 MW


Manager NEM Real Time Operations






59965RESERVE NOTICE21/11/2017 05:40:27 PM

Cancellation of Actual (LOR1) condition in the Vic region - 21/11/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the Vic region - 21/11/2017

The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.59963 is cancelled at 1730 hrs 21/11/2017.


Manager NEM Real Time Operations
59963RESERVE NOTICE21/11/2017 04:21:26 PM

Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 21/11/2017

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 21/11/2017

An Actual LOR1 condition has been declared for the Vic Region from 1600 hrs.

The Actual LOR1 condition is forecast to exist until 1700 hrs

The contingency capacity reserve required is 1154 MW

The minimum reserve available is 1109 MW


Manager NEM Real Time Operations






58148RESERVE NOTICE20/03/2017 01:00:22 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017
An Actual LOR1 condition has been declared for the South Australia Region from 1255 hrs.
The Actual LOR1 condition is forecast to exist until 1700 hrs
The contingency capacity reserve required is 440 MW
The minimum reserve available is 250MW

Manager NEM Real Time Operations
57821RESERVE NOTICE03/03/2017 06:36:31 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017

The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57820 is cancelled at 1835 hrs 03/03/2017

Manager NEM Real Time Operations
57820RESERVE NOTICE03/03/2017 05:52:07 PM

Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017

The Actual LOR2 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57818 & 57819 is cancelled at 1730 hrs 03/03/2017

An Actual LOR1 condition exists and is forecast to exist until 1830 hrs.
The contingency capacity reserve required is 450 MW
The minimum reserve available is 281 MW
AEMO is seeking a market response.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm