114399RESERVE NOTICE06/02/2024 07:22:16 PM

Update - Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

Update - Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024

The actual LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 114397 has been updated at 1915 hrs 06/02/2024 to the following:

The Actual LOR1 condition is forecast to exist until 2000 hrs.

The forecast capacity reserve requirement is 1045 MW.
The minimum capacity reserve available is 950 MW.

Manager NEM Real Time Operations
114397RESERVE NOTICE06/02/2024 06:08:41 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs

The capacity reserve requirement is 1095 MW
The minimum capacity reserve available is 892 MW

Manager NEM Real Time Operations
113998RESERVE NOTICE29/01/2024 08:23:46 PM

Cancellation of Actual (LOR1) condition in the QLD region - 29/01/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 29/01/2024

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.113994 is cancelled at 2000 hrs 29/01/2024.

Manager NEM Real Time Operations
113994RESERVE NOTICE29/01/2024 06:12:37 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 29/01/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 29/01/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1810 hrs.

The Actual LOR1 condition is forecast to exist until 1900 hrs.

The forecast capacity reserve requirement is 1197 MW.
The minimum capacity reserve available is 1026 MW.

Manager NEM Real Time Operations
113892RESERVE NOTICE27/01/2024 08:46:54 PM

Cancellation of Actual (LOR1) condition in the QLD region - 27/01/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 27/01/2024

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.113871 is cancelled at 2045 hrs 27/01/2024.

Manager NEM Real Time Operations
113871RESERVE NOTICE27/01/2024 06:27:46 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 27/01/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 27/01/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 1900 hrs.

The forecast capacity reserve requirement is 1000 MW.
The minimum capacity reserve available is 664 MW.

Manager NEM Real Time Operations
113860POWER SYSTEM EVENTS27/01/2024 02:49:35 PM

Cancellation - Non-credible contingency event - QLD region - 27/01/2024

AEMO ELECTRICITY MARKET NOTICE.

Cancellation - Non-credible contingency event - QLD region - 27/01/2024

Refer AEMO Electricity Market Notice 113825

At 0138 hrs the Gin Gin (H6) No.2 275 kV Busbar tripped.

AEMO has received further information and now determines this was not a non-credible contingency event.

Manager NEM Real Time Operations
113825POWER SYSTEM EVENTS27/01/2024 01:57:16 AM

Non-credible contingency event - QLD region - 27/01/2024

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - QLD region - 27/01/2024

At 0138 hrs the Gin Gin (H6) No.2 275 kV Busbar tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
113662POWER SYSTEM EVENTS23/01/2024 11:31:54 AM

Update - Non-credible contingency event - QLD region - 23/01/2024

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - QLD region - 23/01/2024

Refer AEMO Electricity Market Notice 113659

At 1122 hrs the H35 Strathmore No2 275 kV bus was returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

Nebo - Strathmore 878 275 kV line to remain out of service.

See Network Outage Scheduler (NOS) for further details.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm