110340POWER SYSTEM EVENTS21/10/2023 02:56:51 AM

Update Non-credible contingency event - QLD region - 21/10/2023

AEMO ELECTRICITY MARKET NOTICE.

Update Non-credible contingency event - QLD region - 21/10/2023

Refer to market notice 110339.

At 0133 hrs the Ross No 2 275kV Bus tripped.

AEMO did not instruct load shedding.

AEMO has been advised of disconnection of 218 MW bulk electrical load.

The 132kV network between Clare South and Tully has been disconnected

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
110339POWER SYSTEM EVENTS21/10/2023 02:18:43 AM

Non-credible contingency event - QLD region - 21/10/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - QLD region - 21/10/2023

At 0133 hrs the Ross No 2 275kV Bus tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
110331POWER SYSTEM EVENTS19/10/2023 02:47:35 PM

Non-credible contingency event - VIC region - 19/10/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - VIC region - 19/10/2023

At 1437 hrs the Moorabool No.2 500kV bus tripped

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
110294RESERVE NOTICE17/10/2023 11:13:14 AM

Cancellation of Actual (LOR1) condition in the TAS region - 17/10/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the TAS region - 17/10/2023

The Actual LOR1 Condition in the TAS Region advised in AEMO Electricity Market Notice No.110293 is cancelled at 1100 hrs 17/10/2023.

Manager NEM Real Time Operations
110293RESERVE NOTICE17/10/2023 10:22:10 AM

Actual Lack Of Reserve Level 1 (LOR1) in the TAS region - 17/10/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the TAS region - 17/10/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the TAS region from 1000 hrs.
The Actual LOR1 condition is forecast to exist until 1100 hrs

The capacity reserve requirement is 703 MW
The minimum capacity reserve available is 695 MW

Manager NEM Real Time Operations
110291POWER SYSTEM EVENTS17/10/2023 09:20:16 AM

Update - Non-credible contingency event - SA region - 17/10/2023

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - SA region - 17/10/2023

Refer AEMO Electricity Market Notice 110289

At 0845 hrs the Penola_W Kincraig 132kV line was returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
110289POWER SYSTEM EVENTS17/10/2023 08:25:17 AM

Non-credible contingency event - SA region - 17/10/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - SA region - 17/10/2023

At 0711 hrs the Penola_W Kincraig 132kV line offloaded at one end only, during switching for planned outage of Kincraig No.1 132/33/11kV transformer.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
110253POWER SYSTEM EVENTS13/10/2023 03:01:05 PM

Non-credible contingency event - SA region - 13/10/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - SA region - 13/10/2023

At 1402 hrs, the Para 6543 275kV CB tripped offloading the Para No.2 275/66kV transformer at one end only.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
110234POWER SYSTEM EVENTS12/10/2023 04:39:52 PM

Update - Non-credible contingency event - SA region - 12/10/2023

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - SA region - 12/10/2023

Refer AEMO Electricity Market Notice 110232

At 1609 hrs the South East Nos 1 and 2 SVCs were returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations