Market Notices

114632RESERVE NOTICE13/02/2024 03:19:41 PM

Cancellation of Actual (LOR3) condition in the VIC region - 13/02/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR3) condition in the VIC region - 13/02/2024

The Actual LOR3 Condition in the VIC region advised in AEMO Electricity Market Notice No.114604 is cancelled at 1515 hrs 13/02/2024.

Manager NEM Real Time Operations
     
114607LOAD SHED13/02/2024 02:35:06 PM

Load Shedding Direction in the Vic Region

AEMO ELECTRICITY MARKET NOTICE

Load Shedding Direction in the Vic Region

AEMO has directed load shedding commencing at 1420 hrs 13/02/2024
in the Victoria region to restore power system security.

The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.

Manager NEM Real Time Operations
     
114604RESERVE NOTICE13/02/2024 02:27:41 PM

Actual Lack Of Reserve Level 3 (LOR3) in the VIC region - 13/02/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 3 (LOR3) in the VIC region - 13/02/2024

Customer load shedding of non-interruptible load is occurring in the VIC region as a result of a shortfall of available capacity reserves.

An Actual LOR3 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the VIC region from 1420 hrs.
The Actual LOR3 condition is not forecast in Pre Dispatch.

The maximum load to be interrupted is up to 450 MW from 1420 hrs 13/02/2024

Manager NEM Real Time Operations
     
90011NEM SYSTEMS30/08/2021 10:14:28 AM

CHG0069544 : 5MS - Market Trials Defect Release (Pre-Prod)

Market Notice

Change Number: CHG0069544

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: MSATS - Consumer Administration and Transfer Solution(CATS)

Change Title: 5MS - Market Trials Defect Release (Pre-Prod)

Change Start Date & Time: 31/08/2021 18:00:00 AEST

Change End Date & Time: 01/09/2021 16:00:00 AEST

Outage Start Date & Time: 31/08/2021 18:00:00 AEST

Outage End Date & Time: 31/08/2021 20:00:00 AEST

Change Description:

This outage is to allow the deployment of MSATS and eEMDM Pre-Production as part of 5MS Market Trials . MSATS will be unavailable during this outage period.

Environment: Pre-Production

Participant Impact and Requirements:

There will be no access to the Pre-Production MSATS system for the duration of the outage. Please access outside these hours.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
88403NEM SYSTEMS19/07/2021 09:07:46 AM

INC0072513 : Marketnet VPN at Norwest having intermittent issues - Resolved

AEMO ELECTRICITY MARKET NOTICE
INC0072513 - Marketnet VPN at Norwest having intermittent issues - Resolved

Participants should now be able to connect to the Norwest site-site VPN
For further enquiries please contact the AEMO Support Hub
Phone: 1300 236 600
Email: supporthub@aemo.com.au
AEMO IT Duty Manager
66819RESERVE NOTICE25/01/2019 01:50:40 PM

Cancellation of Actual (LOR3) condition in the Vic region - 25/01/2019

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR3) condition in the Vic region - 25/01/2019

The Actual LOR3 Condition in the Vic region advised in AEMO Electricity Market Notice No.66768 is cancelled at 1350 hrs 25/01/219.

Manager NEM Real Time Operations
66817LOAD SHED25/01/2019 01:54:37 PM

Cancellation - Load Restoration Direction in the Vic Region - 25/01/2019

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Load Restoration Direction in the Vic Region - 25/01/2019

Refer to AEMO Electricity Market Notice 66812
Direction to restore all shed load issued at 1350 hrs 25/01/2019

Manager NEM Real Time Operations
66812LOAD SHED25/01/2019 01:26:52 PM

Load Restoration Direction in the Vic Region

AEMO ELECTRICITY MARKET NOTICE

Load Restoration Direction in the Vic Region

AEMO has directed load restoration commencing at 1325 hrs 25/01/2019
in the Victoria region

The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.

Manager NEM Real Time Operations
66773LOAD SHED25/01/2019 11:14:40 AM

Load Shedding Direction in the Vic Region

AEMO ELECTRICITY MARKET NOTICE

Load Shedding Direction in the Vic Region

AEMO has directed load shedding commencing at 1100 hrs 25/01/2019
in the Victoria region to maintain power system security.

The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.

Manager NEM Real Time Operations
X