Filter by category
Filter by Date
Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region - PDPASA - 7 Jul 2016
AEMO declares a Forecast LOR2 condition for the SA Region.
From 1830 hrs to 1900 hrs 7 July 2016
The contingency capacity reserve required is 200 MW
The minimum reserve available is 195 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Cancellation of the Forecast (LOR2) condition in the SA region - PDPASA - 07 July 2016
Cancellation of the Forecast (LOR2) condition in the SA region - PDPASA - 07 July 2016
The Forecast LOR2 condition in the SA Region advised in AEMO Electricity Market Notice No.54241 and 54232 is cancelled at 1715 hrs 07 July 2016
Manager NEM Real Time Operations
Update - Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
RE: AEMO Electricity Market Notice No. 54232
Update - Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
AEMO declares a Forecast LOR2 condition for the SA region.
From 1830 hrs to 1900 hrs 07 July 2016
The contingency capacity reserve required is 200 MW
The minimum reserve available is 192 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
Forecast Lack of Reserve Level 2 (LOR2) in the SA region - PDPASA - 07 July 2016
AEMO declares a Forecast LOR2 condition for the SA region.
From 1830 hrs to 1930 hrs 07 July 2016
The contingency capacity reserve required is 220 MW
The minimum reserve available is 198 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Update - Raise Regulation FCAS Increased - 04/07/16
Update -Variation to FCAS regulation requirements: NEM Global - 04/07/2016.
Refer MN 54216
FCAS Raise regulation requirements were increased to manage time error to within standards.
The following constraints was invoked to manage raise regulation requirements.
F-MAIN_RREG_0350 invoked from 1320 hrs to 1355 hrs.
Manager NEM Real Time Operations
Update - Raise Regulation FCAS Increased - 04/07/16
Variation to FCAS regulation requirements: NEM Global - 04/07/2016.
FCAS Raise regulation requirements were increased to manage time error to within standards.
The following constraints was invoked to manage raise regulation requirements.
F-MAIN_RREG_0350 invoked from 1320 hrs.
Manager NEM Real Time Operations
Network Augmentation Commissioned - VIC Region, 3 July 2016
Network Augmentation Commissioned in the Victoria Region
Refer to Market Notice 51470.
The Ararat Terminal Station to Ararat Wind Farm 132kV transmission line was commissioned at 1250 hrs, 3 July 2016.
Manager NEM Real Time Operations
Cancellation of the Forecast (LOR2) condition in the South Australia Region - STPASA
Cancellation of the Forecast (LOR2) condition in the SA Region - STPASA - 07/07/2016
The Forecast LOR2 condition in the SA Region advised in AEMO Electricity Market Notice No 54191 is cancelled at 1015 hrs 02/07/2016.
Manager NEM Real Time Operations
FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the South Australia region (ST PASA).
FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the South Australia region (ST PASA).
AEMO declares a forecast LOR2 condition for the South Australia region for the following period.
Thursday 7th July 2016 from 1830 hrs to 1900 hrs
The minimum reserve available is 196 MW.
This calculation is based on a LOR2 trigger level of 200 MW.
AEMO is seeking a market response.
Manager NEM Real Time Operations