Market Notices

57406RESERVE NOTICE10/02/2017 07:44:57 PM

Cancellation - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 10-02-2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 10-02-2017

Refer Electricity Market Notice 57402

The Actual LOR1 declared for the NSW region is cancelled from 1930 hrs.

Manager NEM Real Time Operations
57402RESERVE NOTICE10/02/2017 06:38:15 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region - 10-02-2017

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1 in the NSW Region - 10-02-2017

An Actual LOR1 condition has been declared for the NSW region from 1830 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs
The contingency capacity reserve required is 1340 MW
The minimum reserve available is 843 MW

Manager NEM Real Time Operations
57399MARKET INTERVENTION10/02/2017 06:12:40 PM

Cancellation - AEMO Electricity Market Direction - NSW Region

AEMO ELECTRICITY MARKET NOTICE.

Cancellation - AEMO Electricity Market Direction - NSW Region

Refer AEMO Electricity Market Notice 57397

Direction cancelled at 1801 hrs Friday, 10 February 2017


Manager NEM Real Time Operations
57397MARKET INTERVENTION10/02/2017 05:43:05 PM

AEMO Electricity Market Direction - NSW Region

AEMO ELECTRICITY MARKET NOTICE.

In accordance with Section 116 National Electricity Law and clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the NSW region.

The direction was necessary to maintain the power system in a secure operating state.

The direction was issued at 1658 hrs 10/02/17 and is expected to stay in place until 1800 hrs 10/02/17.

Manager NEM Real Time Operations
57359RESERVE NOTICE10/02/2017 01:00:01 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region- 10-02-2017

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region- 10-02-2017

An Actual LOR1 condition has been declared for the NSW Region from 1250 hrs.
The Actual LOR1 condition is forecast to exist until 2000 hrs
The contingency capacity reserve required is 1345 MW
The minimum LOR1 reserve available is 861 MW

Manager NEM Real Time Operations
57350RESERVE NOTICE09/02/2017 08:07:42 PM

Cancellation of Actual (LOR1) condition in the South Australia region.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region.

Refer to AEMO Electricity Market Notice No. 57349

The Actual LOR1 Condition in the South Australia Region is cancelled at 2000 hrs Thursday, 9 February 2017.


Manager NEM Real Time Operations

57349RESERVE NOTICE09/02/2017 07:20:35 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. PD PASA.

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.

An Actual LOR1 condition has been declared for the South Australia Region.

From 1900 hrs to 2000 hrs Thursday, 9 February 2017

The contingency capacity reserve required is 253 MW

The minimum reserve available is 200 MW


Manager NEM Real Time Operations
57347MARKET INTERVENTION09/02/2017 07:09:55 PM

Cancellation - Direction South Australia Region Thursday, 9 February 2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Direction South Australia Region Thursday, 9 February 2017

Refer AEMO Electricity Market Notices 57312 and 57340

Direction cancelled at 1900 hrs Thursday, 9 February 2017

Manager NEM Real Time Operations


57340MARKET INTERVENTION09/02/2017 05:17:48 PM

Update - Direction - South Australia region - 9/02/17

AEMO ELECTRICITY MARKET NOTICE.

Update to AEMO Electricity Market Notice No. 57312

For the duration of the direction referred to in Market Notice 57312, AEMO has applied constraints to generating units in the South Australia region to minimise the effect on interconnector flows and minimise the number of Affected Participants in accordance with clause 4.8.9(h) of the National Electricity Rules.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm