Update - Non-credible contingency event - Tas region - 20/12/16
Update - Non-credible contingency event - Tas region - 20/12/16
In addition to the non-credible contingency event at 0933 hrs (refer to market notice 56344), there was a further non-credible contingency event at 0939 hrs as described below.
At 0939 hrs the following generation tripped in the Tasmania region
Wilmot, Lemonthyme, Cethana, Devils Gate, Fisher and Rowallan
At approximately the same time there was approximately 170 MW of major industrial load reduction.
The cause of this non credible contingency event is not known at this stage.
AEMO did not instruct load shedding.
Manager NEM Real Time Operations
Non-credible contingency event - Tas region - 20/12/16
Non-credible contingency event - Tas region - 20/12/16
At 0933 hrs the Sheffield - George Town No. 1 and No. 2 220 kV Lines tripped simultaneously.
The cause of this non credible contingency event is not known at this stage.
AEMO did not instruct load shedding.
Manager NEM Real Time Operations
Non-credible contingency event - Vic region - 20/12/16
Non-credible contingency event - Vic region - 20/12/16
At 0738 hrs the Eildon Mount Beauty No. 1 and No. 2 220 kV Lines tripped simultaneously. There is lightning occurring in the vicinity of these lines.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
Manager NEM Real Time Operations
Update - Non-credible contingency event - Queensland region - Saturday, 17 December 2016
Update - Non-credible contingency event - Queensland region - Saturday, 17 December 2016
Update to market notice 56316
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - Queensland region - Saturday, 17 December 2016
Non-credible contingency event - Queensland region - Saturday, 17 December 2016
Dysart No1 132 kV Busbar tripped at 2223 hrs
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update: Simultaneous trip of Basslink and Farrell - Shefield No. 1 220 kV line- Tas region
Update: Simultaneous trip of Basslink and Farrell - Shefield No. 1 220 kV line - Tas region. 05-12-2016
Refer to MN 56165, 56155 and 47855
At 0043 hrs the Basslink and Farrell - Shefield No. 1 220 kV line tripped simultaneously. This simultaneous trip is currently declared a credible contingency event - Refer to MN 47855
Farrell - Sheffield No1 220 kV line returned to service at 0047 hrs
Basslink returned to service at 0245 hrs
Constraint set I-BL_ZERO revoked at 0245 hrs.
The outage constraint set contains the following interconnector onthe left hand side.
T-V_MNSP1
Manager NEM Real Time Operations
Update: Simultaneous trip of Basslink and Farrell - Shefield No. 1 220 kV line- Tas region
Update: Simultaneous trip of Basslink and Farrell - Shefield No. 1 220 kV line - Tas region. 05-12-2016
Refer to MN 56155 and 47855
At 0043 hrs the Basslink and Farrell - Shefield No. 1 220 kV line tripped simultaneously. This simultaneous trip is currently declared a credible contingency event - Refer to MN 47855
Simultaneously with this event AEMO has observed a reduction in the electrical demand in the TAS region of approximately 390 MW due to SPS action.
AEMO did not instruct load shedding.
Constraint set invoked:
I-BL_ZERO
The outage constraint set contains the following interconnector onthe left hand side.
T-V_MNSP1
Manager NEM Real Time Operations
Non credible contingency: Simultaneous trip of Basslink and Farrell - Shefield No. 1 220 kV line- Tas region
Non-credible contingency event - Tas region - 05-12-2016
At 0043 hrs the Basslink and Farrell - Shefield No. 1 220 kV line tripped simultaneously.
Simultaneously with this event AEMO has observed a reduction in the electrical demand in the Tas region of approximately 390 MW due to SPS action.
AEMO did not instruct load shedding.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Direction ceased - Victoria Region region 1/12/16
Direction - Victoria Region region 1/12/16
In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the Victoria region.
The direction was necessary to re-establish the power system to a secure operating state,
The direction was issued at 1030 hrs and ceased at 1545hrs /1/2/16