Market Notices

53440INTER-REGIONAL TRANSFER20/05/2016 05:49:54 AM

Cancellation - Inter-regional transfer limit variation for Transient Stability Limit

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-regional transfer limit variation for Transient Stability Limit - Vic Region - 20 May 2016

Refer to Market Notice 53436

The AEMO Dynamic Stability Analysis application is no longer indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region.

Constraint V-DSA_STAB-100 revoked at 0550 hrs

Manager NEM Real Time Operations
53439INTER-REGIONAL TRANSFER20/05/2016 05:33:29 AM

Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 20 May 2016

Refer Market Notice 53435

The Tarong to South Pine (832) 275kV Line has been returned to service.

The following constraint set was revoked at 0535 hrs..

Q-TRSP_832

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1


Manager NEM Real Time Operations
53438INTER-REGIONAL TRANSFER20/05/2016 05:03:03 AM

Cancellation - Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control - Monday, 16 May 2016

Refer to Market Notice 53437

The Greenbank to Middle Ridge (8849) 275kV Line was returned to service.

The following constraint set was revoked at 0505 hrs.

Q-MRGB_8848_8849

The constraint set contains equations with the following interconnectors on the LHS.

NSW-QLD1
N-Q-MNSP1


Manager NEM Real Time Operations
53437INTER-REGIONAL TRANSFER20/05/2016 02:25:37 AM

Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control - 20 May 2016

The Greenbank to Middle Ridge (8849) 275kV Line has been de-energised to manage voltages in the Qld region.

The following constraint set was invoked at 0225 hrs until further notice.

Q-MRGB_8848_8849

The constraint set contains equations with the following interconnectors on the LHS.

NSW-QLD1
N-Q-MNSP1



Manager NEM Real Time Operations
53436INTER-REGIONAL TRANSFER20/05/2016 02:15:07 AM

Inter-regional transfer limit variation for Transient Stability Limit - Vic Region - 20 May 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation for Transient Stability Limit - Vic Region - 20 May 2016

The AEMO Dynamic Stability Analysis application is indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region.

The following constraints have been invoked to apply offset reductions to the Victoria transient stability export limit.

Constraint V-DSA_STAB-050 invoked from 0215 hrs until further notice

Constraints have the following interconnectors on the LHS
NSW1-QLD1
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1

Manager NEM Real Time Operations
53435INTER-REGIONAL TRANSFER20/05/2016 01:15:07 AM

Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 20 May 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 20 May 2016

The Tarong to South Pine (832) 275kV Line has been de-energised to manage voltages in the Qld region.

The following constraint set was invoked at 0115 hrs until further notice.

Q-TRSP_832

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1


Manager NEM Real Time Operations
53430PRICE ADJUSTMENT19/05/2016 05:09:42 PM

[EventId:201605191025_confirmed] Prices for interval 19-May-2016 10:25 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1709 hrs on 19 May 2016

PRICES ARE NOW CONFIRMED for dispatch interval 19-May-2016 10:25.

In accordance with Market Notice 53415 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
ENERGY
TAS1 $13,800.00 $345.80
RAISE5MIN
TAS1 $13,800.00 $4.20
RAISE60SEC
TAS1 $13,800.00 $68.30
RAISE6SEC
TAS1 $13,800.00 $162.35
RAISEREG
TAS1 $13,800.00 $4.20


This is an AEMO autogenerated Market Notice.
53429PRICE ADJUSTMENT19/05/2016 05:08:45 PM

[EventId:201605191020_confirmed] Prices for interval 19-May-2016 10:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1708 hrs on 19 May 2016

PRICES ARE NOW CONFIRMED for dispatch interval 19-May-2016 10:20.

In accordance with Market Notice 53414 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
- Over-Constrained Dispatch has been resolved for dispatch interval

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
ENERGY
TAS1 $13,800.00 $317.78
LOWER6SEC
TAS1 $13,800.00 $0.12
RAISE5MIN
TAS1 $13,800.00 $4.20
RAISE60SEC
TAS1 $13,800.00 $0.80
RAISE6SEC
TAS1 $13,800.00 $311.97
RAISEREG
TAS1 $13,800.00 $4.20


This is an AEMO autogenerated Market Notice.
53401INTER-REGIONAL TRANSFER18/05/2016 05:14:33 AM

Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - 18 May 2016

Refer MN 53400

The Tarong to South Pine (832) 275kV Line has been returned to service.

The following constraint set was revoked at 0540 hrs..

Q-TRSP_832

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1


Manager NEM Real Time Operations
X