Market Notices

56025RESERVE NOTICE01/12/2016 09:06:57 AM

Update - Actual LOR2 South Australia Region - 1/12/16

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 1/12/16
Refer AEMO Electricity Market Notice 55867 and 55904
An actual LOR2 condition has been declared for the South Australia region from 0700 hrs 30/11/16 and is forecast to continue until further notice following the unplanned outage of the Moorabool Tarone 500 kV line in Victoria.
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
See Network Outage Schedule (NOS) for further details

Manager NEM Real Time Operations
56022MARKET INTERVENTION01/12/2016 07:42:37 AM

AEMO Intervention Event intervention price dispatch intervals - 1/12/16

AEMO ELECTRICITY MARKET NOTICE.

AEMO Intervention Event intervention price dispatch intervals - 1/12/16
Refer AEMO Electricity Market Notice no. 55973 and 56015
An AEMO Intervention Event has been implemented by issuing a direction to maintain the power system in a secure operating state.
AEMO declares all dispatch intervals during the AEMO Intervention Event to be intervention price dispatch intervals.
The AEMO Intervention Event commenced in the 0135 hrs dispatch interval.
Intervention pricing will be implemented during these intervention price dispatch intervals from the 0135 hrs dispatch interval until the end of the AEMO Intervention Event at 0500 hrs 1/12/16

Manager NEM Real Time Operations

56015MARKET INTERVENTION01/12/2016 05:02:31 AM

Cancellation of Directions - South Australia region 01/12/2016

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of Directions - South Australia region 01/12/2016

In accordance with clause 4.8.9 of the National Electricity Rules AEMO had issued directions to participants in the South Australia region.

The directions were necessary to maintain the power system in a secure operating state.

The directions are no longer required and have been cancelled from 0500 hrs 01/12/2016

Manager NEM Real Time Operations
55973MARKET INTERVENTION01/12/2016 02:34:54 AM

Direction - South Australia region 01/12/2016

AEMO ELECTRICITY MARKET NOTICE.

Direction - South Australia region 01/12/2016

In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued directions to participants in the South Australia region.

The directions were necessary to maintain the power system in a secure operating state.

The directions was issued from 0130 hrs 01/12/2016 and will remain in place until further notice.

Manager NEM Real Time Operations
55904RESERVE NOTICE30/11/2016 07:48:43 AM

Actual LOR2 South Australia Region - 30/11/16

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 30/11/16
Refer AEMO Electricity Market Notice 55867
An actual LOR2 condition has been declared for the South Australia region from 0700 hrs and is forecast to continue until 1600 hrs 01/12/16 during a planned outage of the Heywood No2 500 kV bus in Victoria.
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.

Manager NEM Real Time Operations






55843RESERVE NOTICE26/11/2016 10:17:18 AM

Cancellation of the Actual (LOR2) condition in the South Australia region 26 Nov 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Actual (LOR2) condition in the South Australia region 26 Nov 2016

Refer to AEMO Electricity Market Notice No. 55810

The Actual LOR2 condition in the South Australia Region is cancelled at 1000 hrs 26 Nov 2016 following the return to service of the Heywood to South East No.1 275 kV transmission line.


Manager NEM Real Time Operations

55810RESERVE NOTICE22/11/2016 07:23:33 AM

Actual LOR2 South Australia Region - 22 Nov 2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 22 Nov 2016

Refer to MN 55466

An actual LOR2 condition has been declared for the South Australia region from 0715 hrs and is forecast to continue until further notice during the following planned outages detailed below:

[1] Heywood to South East No.1 275 kV transmission line

If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.

Manager NEM Real Time Operations
55615RESERVE NOTICE09/11/2016 08:23:15 PM

Cancellation - Actual LOR2 South Australia Region - 09 Nov 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Actual LOR2 South Australia Region - 09 Nov 2016

Refer AEMO Electricity Market Notice 55577

The Actual LOR2 condition in the South Australia Region is cancelled at 2010 hrs 09 Nov 2016

Manager NEM Real Time Operations
55577RESERVE NOTICE08/11/2016 06:28:49 AM

Actual LOR2 South Australia Region - 8/11/2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 8/11/2016

An actual LOR2 condition has been declared for the South Australia region from 0600 hrs and is forecast to continue until further notice during the following planned outages detailed below:

[1] Heywood No.2 500 kV busbar from 0600 hrs 08/11/2016 to 1600 hrs 09/11/2016.
[2] Heywood to Mortlake 500 kV transmission line from 0600 hrs to 1600 hrs daily on 08/11/2016 and 09/11/2016.

If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm