110011INTER-REGIONAL TRANSFER28/09/2023 06:34:25 PM

Inter-Regional Transfer limit variation - Murraylink control unavailable (SA Region)

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Murraylink control unavailable (SA Region)

AEMO has been notified that the controls to vary Murraylink output are unavailable until further notice.

Constraint set I-CTRL_ISSUE_ML invoked from 1835 hrs.

The constraint set contains equations with the following interconnector on the LHS:

V-S-MNSP1


Manager NEM Real Time Operations
109996INTER-REGIONAL TRANSFER28/09/2023 11:14:31 AM

Inter-Regional Transfer limit variation - Directlink - NSW Region

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Directlink - NSW Region

There has been an unplanned outage of all three Legs of Directlink .

The following constraint set was invoked at 1100 hrs 28/09/2023

N-X_MBTE_3

The constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Refer AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
109981INTER-REGIONAL TRANSFER27/09/2023 12:57:01 PM

Inter-regional transfer limit variation - Boambee South - Nambucca 9W7 132 kV Line - NSW region - 27/09/2023

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Boambee South - Nambucca 9W7 132 kV Line - NSW region - 27/09/2023

At 1236 hrs 27/09/2023 there was an unplanned outage of the Boambee South - Nambucca 9W7 132 kV Line.

Constraint set(s) invoked: N-CHKS_ONE

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
109798INTER-REGIONAL TRANSFER14/09/2023 09:33:08 AM

Inter-regional transfer limit variation - Lismore132 7B1 132 kV CB - NSW region - 14/09/2023

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Lismore132 7B1 132 kV CB - NSW region - 14/09/2023

At 0900 hrs 14/09/2023 there was a short notice outage of Lismore132 7B1 132 kV CB which offloads the Lismore132 Dunoon 9U6/L 132kV LINE.


The following constraint set(s) invoked at 0900 hrs 14/09/2023
N-LSDU_9U6

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
109660INTER-REGIONAL TRANSFER06/09/2023 02:19:27 AM

Cancellation Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)

AEMO ELECTRICITY MARKET NOTICE

Cancellation Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region).

Refer AEMO Electricity Market Notice 109659

AEMO has been notified that the controls to vary Directlink output are now available.

Constraint set I-CTRL_ISSUE_TE revoked at 0215 hrs.

Manager NEM Real Time Operations
109659INTER-REGIONAL TRANSFER06/09/2023 01:32:25 AM

Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)

AEMO has been notified that the controls to vary Directlink output are unavailable until further notice.

Constraint set I-CTRL_ISSUE_TE invoked from 0130 hrs.

The constraint set contains equations with the following interconnector on the LHS:

N-Q-MNSP1


Manager NEM Real Time Operations
109614INTER-REGIONAL TRANSFER05/09/2023 08:05:05 AM

Inter-regional transfer limit variation - Heywood - Mortlake PS 500 kV Line - VIC region - 05/09/2023

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Heywood - Mortlake PS 500 kV Line - VIC region - 05/09/2023

A planned outage of Heywood - Mortlake PS 500 kV Line in the VIC region was scheduled from 0800 hrs 05/09/2023 to 1700 hrs 05/09/2023.

The outage has been cancelled.

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
109547INTER-REGIONAL TRANSFER03/09/2023 06:12:47 AM

Inter-Regional Transfer limit variation - Murraylink

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Murraylink

There has been an unplanned outage of the Murraylink interconnector.

The following constraint set was invoked at 0610 hrs 03/09/2023

I-MURAYLINK

The constraint set contains the following interconnectors on the left hand side.

V-S-MNSP1
VIC1-NSW1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
109447INTER-REGIONAL TRANSFER25/08/2023 05:32:12 PM

Inter-regional transfer limit variation - LeFevre 6576 275 kV CB- SA region - 25/08/2023

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - LeFevre 6576 275 kV CB- SA region - 25/08/2023

At 1730 hrs 25/08/2023 there was a short notice outage of the LeFevre 6576 275 kV CB, de-loading the Pelican Point - Lefevre 275 kV line.

The following constraint set(s) invoked at 1730 hrs 25/08/2023:
S-LFPP_PELPT


This constraint set(s) contains equations with the following interconnectors on the LHS.
V-SA

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm