74987CONSTRAINTS19/03/2020 01:03:38 PM

Revised System Strength limits in North Queensland

AEMO ELECTRICITY MARKET NOTICE

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.

Through this work, AEMO and Powerlink have identified the need, depending on power system conditions, to constrain the output of three generators in North Queensland to maintain power system security.

The constraint equation is expected to limit generation from the three generators depending on power system conditions. The generators are Mt Emerald Wind Farm, Haughton Solar Farm and Sun Metals Solar Farm.

The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF. These will be implemented at 1500hrs EST today.

The minimum generator combinations and limits are:
1 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 2 x Barron Gorge: 100% output
2 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 1 x Barron Gorge: 80% output
3 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Townsville GT: 80% output
4 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge: 70% output
5 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 70% output

If these combinations are not met all three generators have a limit of 0 MW and 0 inverters.

For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au

Ben Blake
AEMO Operations
71869CONSTRAINTS17/12/2019 05:59:11 PM

Increase in Heywood from SA to Vic limit from 500 to 550 MW

AEMO ELECTRICITY MARKET NOTICE

As a part of the Heywood Interconnector upgrade the increase in the upper transfer limit from SA to Victoria is dependent on the commissioning of the over frequency generation scheme (OFGS). The OFGS has now been commissioned AEMO has completed and detailed analysis of power system limits at higher transfers.

AEMO will increase the Heywood limit from SA to Vic (from the current 500 MW) to 550 MW and the combined (Heywood and Murraylink) SA to Vic limit from 650 to 700 MW at 1000 hrs on 18 Dec 2019.

The following constraint sets will be revoked:
I-SV_500_TEST
I-SVS_650_TEST


The following constraint sets will be invoked:
I-SV_550_TEST
I-SVS_700_TEST

For more information on the increase:
ElectraNet 2019 APR: https://www.electranet.com.au/what-we-do/network/regulated-network-reports-and-studies/
Inter-network test program: https://www.aemo.com.au/media/Files/Electricity/Consultations/2015/HYTS%20interconnector%20upgrade%20internetwork.pdf

Ben Blake
AEMO Operations
71863RECALL GEN CAPACITY17/12/2019 10:58:16 AM

Request for Generator Recall Information for 18/12/2019 for Victorian Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice no. 71861

Please provide Generator Recall Information for 18/12/2019 by 13:00 hrs on 17/12/2019 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Power_System_Ops/Procedures/SO_OP_3719---Procedure-for-Submitting-Recall-Information-of-Scheduled-Generator-Outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

John Deere
Manager Operations Planning
70782RECALL GEN CAPACITY29/10/2019 03:27:49 PM

Request for Generator Recall Information for the period from 0730 hrs to 1230 hrs 30/10/2019 for Region NSW

AEMO ELECTRICITY MARKET NOTICE

Please provide Generator Recall Information for the period from 0730 hrs to 1230 hrs 30/10/2019, by 19:00 hrs on 29/10/2019 via the Generator Recall communication system, in accordance with the SO_OP_3719 Procedure for Submitting Generator Outage Recall Information.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
69475RECALL GEN CAPACITY25/08/2019 03:06:10 PM

Request for Generator Recall Information for the period from 1730 hrs to 2030 hrs 26/08/2019 for Region NSW

AEMO ELECTRICITY MARKET NOTICE

Please provide Generator Recall Information for the period from 1730 hrs to 2030 hrs 26/08/2019, by 19:00 hrs on 25/08/2019 via the Generator Recall communication system, in accordance with the SO_OP_3719 Procedure for Submitting Generator Outage Recall Information.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
67412RECALL GEN CAPACITY27/02/2019 02:40:45 PM

Request for Generator Recall Information for 01/03/2019 for South Australia Region

AEMO ELECTRICITY MARKET NOTICE

Please provide Generator Recall Information for 01/03/2019 for South Australia Region, by 1800 hrs on 27/02/2019 via the Generator Recall communication system, in accordance with the SO_OP_3719 Procedure for Submitting Generator Outage Recall Information.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:

http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager Operations Planning
66231RECALL GEN CAPACITY31/12/2018 03:01:43 PM

Request for Generator Recall Information for 03/01/2019 for South Australia Region

AEMO ELECTRICITY MARKET NOTICE

Please provide Generator Recall Information for 03/01/2019, by 1000 hrs on 02/01/2019 via the Generator Recall communication system, in accordance with the SO_OP_3719 Procedure for Submitting Generator Outage Recall Information.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:

http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager Operations Planning
65417CONSTRAINTS15/11/2018 01:43:40 PM

Reclassification of QNI SPAR as a credible contingency

AEMO MARKET NOTICE


After 25th August 2018 AEMO reclassified the loss of NSW to Qld (QNI) interconnected as a credible contingency when lightning is nearby (as per SO_OP_3715 section 11.4). The limits on QNI under this reclassification are based on the available FCAS in Queensland and NSW - normally the limit is between 300-400 MW in either direction.

Following an investigation TransGrid and Powerlink have made setting changes to the auto reclose settings on QNI and provided AEMO with a new reclassification limit on QNI. Now under similar conditions to 25th August the tripped single phases on QNI would reclose and NSW and Qld is not expected to separate.

The new limit of 850 MW will be activated at 1400 hrs November 15th 2018 for use in future reclassifications of QNI for a single phase fault on both circuits.

Constraint Set:
I-QNI_ONE_PHASE_N-2

Ben Blake
AEMO Operations
64203CONSTRAINTS13/09/2018 03:50:30 PM

Updated generator combinations for SA system strength

AEMO MARKET NOTICE

AEMO is continuing to investigate system strength requirements in South Australia.

AEMO has identified 14 additional combinations which meet minimum system strength requirements in South Australia.

New combinations:
LOW_39 - 1 x Pelican Point GT + ST + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_40 - 1 x Pelican Point GT + ST + Quarantine 5 + Dry Creek 1-3
LOW_41 - 2 x Pelican Point GT + ST + Osborne GT & ST
LOW_42 - 2 x Pelican Point GT + ST + Mintaro
LOW_43 - 2 x Pelican Point GT + ST + either Quarantine 5 or Dry Creek 1-3
LOW_44 - 4 x Torrens Island A unit + 1 x Pelican Point GT + ST
LOW_45A - 4 x Torrens Island A unit + Mintaro
LOW_45B - 4 x Torrens Island B unit + Mintaro
LOW_46 - 3 x Torrens Island A unit + 1 x Pelican Point GT + ST + Mintaro
LOW_47 - 3 x Torrens Island A unit + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_48A - 1 x Torrens Island A unit + Osborne GT & ST + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_48B - 1 x Torrens Island B unit + Osborne GT & ST + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_49 - 1 x Torrens Island A unit + 1 x Torrens Island B unit + Quarantine 5 + Dry Creek 1-3 + Mintaro
LOW_50 - 2 x Torrens Island A unit + Quarantine 5 + Dry Creek 1-3 + Mintaro

Replaced combinations:
LOW_25 - 3 x Torrens Island B unit + either Quarantine 5 or Dry Creek 1-3 + Mintaro
LOW_26 - 1 x Torrens Island A unit + 1 x Torrens Island B unit + Osborne GT & ST + Mintaro
LOW_30 - 2 x Torrens Island A unit + Osborne GT & ST + Mintaro
LOW_35 - 1 x Pelican Point GT + ST + Osborne GT & ST + Mintaro

Removed combinations:
LOW_23B
LOW_32
HIGH_14

For more information refer to the updated limits advice:
https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2018/Transfer-Limit-Advice---South-Australian-System-Strength.pdf

A further update to this advice is planned before the end of October 2018.

Ben Blake
AEMO Operations