Market Notices

97599RESERVE NOTICE15/06/2022 10:04:03 AM

STPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 17/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 97316 has been updated at 0900 hrs 15/06/2022 to the following:

1. From 0800 hrs to 0930 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 359 MW at 0800 hrs.

2. From 1700 hrs to 2130 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 382 MW at 1830 hrs.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
97595RESERVE NOTICE15/06/2022 09:35:14 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 15/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97375 has been updated at 0900 hrs to the following:

From 1700 hrs 15/06/2022 to 2330 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 963 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1630 hrs on 15/06/2022.

AEMO Operations
97381RESERVE NOTICE14/06/2022 06:04:44 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 15/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 97366 has been updated at 1800 hrs to the following:

[1.] From 0630 hrs 15/06/2022 to 0830 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1219 MW at 0700 hrs.

[2.] From 1700 hrs 15/06/2022 to 0330 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 2851 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 15/06/2022.

AEMO Operations
97375RESERVE NOTICE14/06/2022 05:58:35 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region beginning on 15/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97363 has been updated at 1800 hrs to the following:

[1.] From 0630 hrs 15/06/2022 to 0830 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 875 MW at 0700 hrs.

[2.] From 1700 hrs 15/06/2022 to 0030 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1152 MW at 1800 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 15/06/2022.

AEMO Operations
97368RESERVE NOTICE14/06/2022 05:27:41 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 15/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 97314 is cancelled at 1730 hrs 14/06/2022

AEMO Operations
97366RESERVE NOTICE14/06/2022 05:13:03 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 15/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 97311 has been updated at 1700 hrs to the following:

[1.] From 0630 hrs 15/06/2022 to 0830 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1186 MW at 0700 hrs.

[2.] From 1000 hrs 15/06/2022 to 1030 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 56 MW at 1000 hrs.

[3.] From 1700 hrs 15/06/2022 to 0400 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 2845 MW at 2000 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 15/06/2022.

AEMO Operations
97363RESERVE NOTICE14/06/2022 05:07:48 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region beginning on 15/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97310 has been updated at 1700 hrs to the following:

[1.] From 0630 hrs 15/06/2022 to 0830 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 800 MW at 0700 hrs.

[2.] From 1700 hrs 15/06/2022 to 2330 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1120 MW at 1800 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 15/06/2022.

AEMO Operations
97352RESERVE NOTICE14/06/2022 04:53:27 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the TAS Region on 15/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the TAS region advised in AEMO Electricity Market Notice No. 97305 is cancelled at 1630 hrs 14/06/2022.

AEMO Operations
97340RESERVE NOTICE14/06/2022 04:33:17 PM

Lack Of Reserve Level 3 (LOR3) PASA Calculations for all regions - 14/06/2022

AEMO ELECTRICITY MARKET NOTICE

Lack Of Reserve Level 3 (LOR3) PASA Calculations for all regions - 14/06/2022

Participants are required to note that the current forecast LOR3 conditions do not reflect the intervention options that AEMO has taken, including directions to scheduled generation. The reserve forecasting process is automated based on bids received at the time of issuing the forecast. This means that in some cases the capacity of directed units is not shown in reserves until shortly before the effective time of direction.

AEMO Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm