98856RESERVE NOTICE22/06/2022 04:24:10 PM

STPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 29/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 Condition in the SA Region advised in AEMO Electricity Market Notice No.98820 has been updated at 1600 hrs 22/06/2022 to the following:

From 1730 hrs 29/06/2022 to 1830 hrs 29/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 258 MW at 1800 hrs.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
98820RESERVE NOTICE22/06/2022 01:56:23 PM

STPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 29/06/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 1700 hrs 29/06/2022 to 1830 hrs 29/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 401 MW at 1800 hrs.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
98743RESERVE NOTICE21/06/2022 02:38:37 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 22/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 98735 is cancelled at 1400 hrs 22/06/2022

AEMO Operations
98741RESERVE NOTICE21/06/2022 02:37:49 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 22/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 98732 is cancelled at 1400 hrs 22/06/2022

AEMO Operations
98739RESERVE NOTICE21/06/2022 02:29:34 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region on 22/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the Vic region advised in AEMO Electricity Market Notice No. 98736 is cancelled at 1400 hrs 22/06/2022

AEMO Operations
98737RESERVE NOTICE21/06/2022 02:28:39 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 22/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98733 is cancelled at 1400 hrs 22/06/2022

AEMO Operations
98736RESERVE NOTICE21/06/2022 02:05:07 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the Vic Region on 22/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the Vic region advised in AEMO Electricity Market Notice No. 98726 has been updated at 1330 hrs to the following:

[1.] From 0900 hrs 22/06/2022 to 0930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 63 MW at 0900 hrs.

[2.] From 1700 hrs 22/06/2022 to 1930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 903 MW at 1730 hrs.

[3.] From 2000 hrs 22/06/2022 to 2200 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1003 MW at 2000 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0830 hrs on 22/06/2022.

AEMO Operations
98735RESERVE NOTICE21/06/2022 02:03:42 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 22/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 98725 has been updated at 1330 hrs to the following:

[1.] From 1730 hrs 22/06/2022 to 1930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 411 MW at 1800 hrs.

[2.] From 2000 hrs 22/06/2022 to 2200 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 412 MW at 2000 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1700 hrs on 22/06/2022.

AEMO Operations
98733RESERVE NOTICE21/06/2022 02:02:08 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 22/06/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 98724 has been updated at 1330 hrs to the following:

[1.] From 0900 hrs 22/06/2022 to 0930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 63 MW at 0900 hrs.

[2.] From 1730 hrs 22/06/2022 to 1930 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 411 MW at 1800 hrs.

[3.] From 2000 hrs 22/06/2022 to 2200 hrs 22/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1003 MW at 2000 hrs.

[4.] From 0130 hrs 23/06/2022 to 0230 hrs 23/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 196 MW at 0130 hrs.


AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0830 hrs on 22/06/2022.

AEMO Operations