55531PRICE ADJUSTMENT31/10/2016 08:30:29 PM

[EventId:201610312035_confirmed] Prices for interval 31-Oct-2016 20:35 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2030 hrs on 31 October 2016

PRICES ARE NOW CONFIRMED for dispatch interval 31-Oct-2016 20:35.

In accordance with Market Notice 55530 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
ENERGY
NSW1 $50.56 $60.98
QLD1 $54.11 $64.37
SA1 $14,000.00 $95.98
TAS1 $39.66 $48.66
VIC1 $42.28 $51.87
RAISEREG
NSW1 $7.40 $12.66
QLD1 $7.40 $12.66
SA1 $7.40 $12.66
TAS1 $7.40 $12.66
VIC1 $7.40 $12.66


This is an AEMO autogenerated Market Notice.
55045PRICE ADJUSTMENT29/09/2016 05:53:59 PM

[EventId:201609282335_confirmed] Prices for interval 28-Sep-2016 23:35 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1753 hrs on 29 September 2016

PRICES ARE NOW CONFIRMED for dispatch interval 28-Sep-2016 23:35.

In accordance with Market Notice 55024 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval

Changed Prices ($/MWh)

TYPE
Region Original Adjusted
Price Price
ENERGY
TAS1 $14.63 $14.63
VIC1 $10.50 $13.73
RAISE6SEC
NSW1 $6.79 $6.80
QLD1 $6.79 $6.80
TAS1 $6.79 $6.80
VIC1 $6.79 $6.80
RAISEREG
TAS1 $13.42 $10.01


This is an AEMO autogenerated Market Notice.
55044PRICE ADJUSTMENT29/09/2016 06:08:44 PM

Market Suspension - Prices have been reviewed and were adjusted

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 18:05 hrs on 29 Sept 2016

Further to the confirmed energy and ancillary service prices published in MN 55045, the energy and ancillary service price for South Australia is determined by the market suspension pricing schedule developed and published in accordance with clause 3.14.5(l) of the NER. The schedule is available on AEMO's website at https:/www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Market-Suspension-Default-Pricing-Schedule and summarised for South Australia at https://www.aemo.com.au/Media-Centre/-/media/81C836099BE5483185D7774ECC1B2F8A.ashx.

Manager Market Monitoring and Change
54508RESERVE NOTICE14/07/2016 08:33:32 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16

AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the South Australia region - 14/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 54507 is cancelled at 2030 hrs 14/07/16

Manager NEM Real Time Operations
54507RESERVE NOTICE14/07/2016 05:46:03 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 14/07/16.

An Actual LOR1 condition has been declared for the SA Region from 1745 hrs.

The Actual LOR1 condition is forecast to exist until 2030 hrs

The contingency capacity reserve required is 440 MW

The minimum reserve available is 342 MW


Manager NEM Real Time Operations
54480RESERVE NOTICE13/07/2016 09:09:28 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16

AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the South Australia region - 13/07/16
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice 544785 is cancelled at 2100 hrs 13/07/16

Manager NEM Real Time Operations
54478RESERVE NOTICE13/07/2016 06:04:37 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. 13/07/16.

An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 2100 hrs

The contingency capacity reserve required is 400 MW

The minimum reserve available is 281 MW


Manager NEM Real Time Operations
54460RESERVE NOTICE12/07/2016 07:44:57 PM

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

Manager NEM Real Time Operations

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region - Tuesday, 12 July 2016

The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No 54458 is cancelled at 1930 hrs Tuesday, 12 July 2016.


Manager NEM Real Time Operations

54458RESERVE NOTICE12/07/2016 07:04:33 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region. Tuesday, 12 July 2016.

An Actual LOR1 condition has been declared for the South Australia Region.

From 1830 hrs to 1930 hrs Tuesday, 12 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 224 MW


Manager NEM Real Time Operations