Market Notices

108776RESERVE NOTICE27/06/2023 10:02:33 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108775 is cancelled at 0900 hrs 27/06/2023.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
108775RESERVE NOTICE27/06/2023 07:38:00 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108773 has been updated at 0730 hrs 27/06/2023 to the following:

[1.] From 1730 hrs 28/06/2023 to 2359 hrs 28/06/2023.
The forecast capacity reserve requirement is 385 MW.
The minimum capacity reserve available is 322 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 28/06/2023.

Manager NEM Real Time Operations
108774RESERVE NOTICE27/06/2023 05:36:18 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 29/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108772 has been updated at 0530 hrs 27/06/2023 to the following:

[1.] From 0000 hrs 29/06/2023 to 0230 hrs 29/06/2023.
The forecast capacity reserve requirement is 395 MW.
The minimum capacity reserve available is 342 MW

[2.] From 0730 hrs 29/06/2023 to 0830 hrs 29/06/2023.
The forecast capacity reserve requirement is 419 MW.
The minimum capacity reserve available is 289 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 28/06/2023.

Manager NEM Real Time Operations
108773RESERVE NOTICE27/06/2023 05:34:56 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108771 has been updated at 0530 hrs 27/06/2023 to the following:

[1.] From 0830 hrs 28/06/2023 to 0900 hrs 28/06/2023.
The forecast capacity reserve requirement is 331 MW.
The minimum capacity reserve available is 325 MW.

[2.] From 0930 hrs 28/06/2023 to 1000 hrs 28/06/2023.
The forecast capacity reserve requirement is 344 MW.
The minimum capacity reserve available is 343 MW.

[3.] From 1730 hrs 28/06/2023 to 2359 hrs 28/06/2023.
The forecast capacity reserve requirement is 384 MW.
The minimum capacity reserve available is 311 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 28/06/2023.

Manager NEM Real Time Operations
108772RESERVE NOTICE26/06/2023 11:41:30 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 29/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108769 has been updated at 2330 hrs 26/06/2023 to the following:

[1.] From 0000 hrs 29/06/2023 to 0300 hrs 29/06/2023.
The forecast capacity reserve requirement is 393 MW.
The minimum capacity reserve available is 334 MW

[2.] From 0730 hrs 29/06/2023 to 0830 hrs 29/06/2023.
The forecast capacity reserve requirement is 397 MW.
The minimum capacity reserve available is 252 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 28/06/2023.

Manager NEM Real Time Operations
108771RESERVE NOTICE26/06/2023 11:42:37 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108770 has been updated at 2330 hrs 26/06/2023 to the following:

[1.] From 0700 hrs 28/06/2023 to 1000 hrs 28/06/2023.
The forecast capacity reserve requirement is 365 MW.
The minimum capacity reserve available is 305 MW.

[2.] From 1730 hrs 28/06/2023 to 2359 hrs 28/06/2023.
The forecast capacity reserve requirement is 374 MW.
The minimum capacity reserve available is 300 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 28/06/2023.

Manager NEM Real Time Operations
108770RESERVE NOTICE26/06/2023 10:02:20 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 28/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108764 has been updated at 2145 hrs 26/06/2023 to the following:

From 2200 hrs 28/06/2023 to 2359 hrs 28/06/2023.
The forecast capacity reserve requirement is 403 MW.
The minimum capacity reserve available is 394 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 28/06/2023.

Manager NEM Real Time Operations
108769RESERVE NOTICE26/06/2023 10:01:12 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 29/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108765 has been updated at 2145 hrs 26/06/2023 to the following:

[1.] From 0000 hrs 29/06/2023 to 0230 hrs 29/06/2023.
The forecast capacity reserve requirement is 414 MW.
The minimum capacity reserve available is 400 MW

[2.] From 0800 hrs 29/06/2023 to 0830 hrs 29/06/2023.
The forecast capacity reserve requirement is 404 MW.
The minimum capacity reserve available is 332 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 28/06/2023.

Manager NEM Real Time Operations
108765RESERVE NOTICE26/06/2023 04:41:36 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 29/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 108753 has been updated at 1600 hrs 26/06/2023 to the following:

1. From 0000 hrs to 0230 hrs 29/06/2023.
The forecast capacity reserve requirement is 445 MW.
The minimum capacity reserve available is 405 MW.

2. From 0700 hrs 29/06/2023 to 0830 hrs 29/06/2023.
The forecast capacity reserve requirement is 477 MW.
The minimum capacity reserve available is 340 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations