PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 03/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1730 hrs 03/06/2022 to 2000 hrs 03/06/2022.
The forecast capacity reserve requirement is 1037 MW.
The minimum capacity reserve available is 246 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the TAS Region on 02/06/2022
The Forecast LOR2 condition in the TAS region advised in AEMO Electricity Market Notice No. 96712 is cancelled at 1420 hrs 01/06/2022.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 02/06/2022
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 96711 is cancelled at 1420 hrs 01/06/2022.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region on 02/06/2022
The Forecast LOR2 condition in the VIC region advised in AEMO Electricity Market Notice No. 96710 is cancelled at 1420 hrs 01/06/2022.
Manager NEM Real Time Operations
ST PASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 02/06/2022
AEMO ELECTRICITY MARKET NOTICE
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 96708 is cancelled at 1300 hrs 01/06/2022.
AEMO Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the TAS Region on 02/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the TAS region for the following period:
[1.] From 0800 hrs 02/06/2022 to 0830 hrs 02/06/2022.
The forecast capacity reserve requirement is 146 MW.
The minimum capacity reserve available is 118 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 02/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 0730 hrs 02/06/2022 to 0830 hrs 02/06/2022.
The forecast capacity reserve requirement is 250 MW.
The minimum capacity reserve available is 118 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region on 02/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following period:
[1.] From 0730 hrs 02/06/2022 to 0900 hrs 02/06/2022.
The forecast capacity reserve requirement is 750 MW.
The minimum capacity reserve available is 118 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 02/06/2022
AEMO ELECTRICITY MARKET NOTICE
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 96705 is cancelled at 1200 hrs 01/06/2022.
AEMO Operations