Filter by category
Filter by Date
Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
RE: AEMO Electricity Market Notice No. 54157 & 54160.
NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following period:
From 04/07/2016 1830 hrs to 1930 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 166 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Harmohan Singh
Operations Planning
Update: Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
RE: AEMO Electricity Market Notice No. 54157.
NOTICE OF UPDATE
AEMO declares forecast LOR2 conditions for the South Australia region for the following periods:
From 04/07/2016 1800 hrs to 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 110 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Harmohan Singh
Operations Planning
Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - STPASA - 04/07/2016
AEMO declares a Forecast LOR2 condition for the South Australia region for the following period:
From 04/07/2016 1800 hrs to 1900 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 165 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Operations Planning
[EventId:201605191025_confirmed] Prices for interval 19-May-2016 10:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1709 hrs on 19 May 2016
PRICES ARE NOW CONFIRMED for dispatch interval 19-May-2016 10:25.
In accordance with Market Notice 53415 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
TAS1 $13,800.00 $345.80
RAISE5MIN
TAS1 $13,800.00 $4.20
RAISE60SEC
TAS1 $13,800.00 $68.30
RAISE6SEC
TAS1 $13,800.00 $162.35
RAISEREG
TAS1 $13,800.00 $4.20
This is an AEMO autogenerated Market Notice.
[EventId:201605191020_confirmed] Prices for interval 19-May-2016 10:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1708 hrs on 19 May 2016
PRICES ARE NOW CONFIRMED for dispatch interval 19-May-2016 10:20.
In accordance with Market Notice 53414 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
- Over-Constrained Dispatch has been resolved for dispatch interval
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
TAS1 $13,800.00 $317.78
LOWER6SEC
TAS1 $13,800.00 $0.12
RAISE5MIN
TAS1 $13,800.00 $4.20
RAISE60SEC
TAS1 $13,800.00 $0.80
RAISE6SEC
TAS1 $13,800.00 $311.97
RAISEREG
TAS1 $13,800.00 $4.20
This is an AEMO autogenerated Market Notice.