Update - Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - PD PASA -Thursday 9th February 2017.
Update - Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - PD PASA -Thursday 9th February 2017.
AEMO declares a Forecast LOR2 condition for the South Australia region.
From 1530 hrs to 1800 hrs Thursday, 9 February 2017
The contingency capacity reserve required is 220 MW
The minimum reserve available is 122 MW
AEMO is seeking a market response.
AEMO determines the latest time it would need to intervene through an AEMO intervention event is 1330 hrs Thursday, 9 February 2017
Manager NEM Real Time Operations
Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- STPASA.
Update - FORECAST LACK OF RESERVE LEVEL 2 (LOR2) in the New South Wales region- ST PASA.
Refer to AEMO Electricity Market Notice 57294
AEMO declares forecast LOR2 conditions for the NSW Region for the following period.
Friday 10th February 2017 from 1400 hrs to 1600 hrs
The minimum reserve available is 56 MW.
Friday 10th February 2017 from 1630 hrs to 1730 hrs
The minimum reserve available is 113 MW.
This calculation is based on a LOR2 trigger level of 700 MW.
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Update - Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - PD PASA -Thursday 9th February 2017.
Update - Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - PD PASA -Thursday 9th February 2017.
AEMO declares a Forecast LOR2 condition for the South Australia region.
From 1630 hrs to 1800 hrs Thursday, 9 February 2017
The contingency capacity reserve required is 200 MW
The minimum reserve available is 156 MW
AEMO is seeking a market response.
AEMO determines the latest time it would need to intervene through an AEMO intervention event is 1430 hrs Thursday, 9 February 2017
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 2 (LOR2) in the NSW region - STPASA - Friday 10 February 2017.
Forecast Lack Of Reserve Level 2 (LOR2) in the NSW region - STPASA - Friday 10 February 2017.
AEMO declares a Forecast LOR2 condition for the NSW region.
From 1530 hrs to 1630 hrs Friday 10 February 2017
The contingency capacity reserve required is 700 MW
The minimum reserve available is 645 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - PD PASA -Thursday 9th February 2017.
Forecast Lack Of Reserve Level 2 (LOR2) in the South Australia region - PD PASA -Thursday 9th February 2017.
AEMO declares a Forecast LOR2 condition for the South Australia region.
From 1700 hrs to 1830 hrs Thursday 9th February 2017
The contingency capacity reserve required is 200 MW
The minimum reserve available is 176 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.
Manager NEM Real Time Operations
Cancellation - Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017
Cancellation - Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017
Refer to MN 56554
AEMO cancels the Forecast LOR2 condition for the SA region.
From 1630 hrs to 1700 hrs 06/01/2017
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017
Forecast Lack Of Reserve Level 2 (LOR2) in the SA region - STPASA - 06/01/2017
AEMO declares a Forecast LOR2 condition for the SA region.
From 1630 hrs to 1700 hrs 06/01/2017
The contingency capacity reserve required is 200 MW
The minimum reserve available is 195 MW
AEMO is seeking a market response.
AEMO will determine the latest time at which it would need to intervene through a AEMO intervention event.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 2 (LOR2) in South Australia region - 23/12/16
Refer to AEMO Electricity Market Notice 56397
Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0700 hrs to 1330 hrs on 23/12/2016.
AEMO declares a Forecast LOR2 condition for the South Australia region during the short notice outage of the Moorabool - Mortlake PS 500 kV Line in Victoria region, from 0700 hrs to 1330 hrs 23/12/16.
On the occurrence of a credible contingency during this planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 2 (LOR2) in South Australia region - 22/12/16
AEMO ELECTRICITY MARKET NOTICE
Refer to AEMO Electricity Market Notice 56379
Forecast Lack Of Reserve Level 2 (LOR2) in South Australia Region - from 0600 hrs to 1530 hrs on 22/12/2016.
AEMO declares a Forecast LOR2 condition for the South Australia region during the planned outage of Heywood - Tarrone PS 500k V line in Victoria region, from 0600 hrs to 1530 hrs 22/12/2016.
On the occurrence of a credible contingency during this planned outage, South Australia region could separate from the rest of the NEM and is likely to result in interruptions to power supplies in South Australia.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but following the next credible contingency it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing interruptions to power supplies in South Australia.
Manager NEM Real Time Operations