63163RESERVE NOTICE08/06/2018 06:07:48 PM

Cancellation of Actual (LOR2) condition in the NSW region - 08/06/2018

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the NSW region - 08/06/2018

The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.63162 is cancelled at 1805 hrs 07/06/2018.

Manager NEM Real Time Operations
63162RESERVE NOTICE08/06/2018 05:44:18 PM

Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 08/06/2018

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 08/06/2018

An Actual LOR2 condition has been declared for the NSW region from 1730 hrs.

The Actual LOR2 condition is forecast to exist until 1830 hrs

The contingency capacity reserve required is 855 MW
The minimum reserve available is 670 MW

AEMO is seeking a market response.

Manager NEM Real Time Operations
63137RESERVE NOTICE07/06/2018 07:04:56 PM

Cancellation of Actual (LOR2) condition in the NSW region - 07/06/2018

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the NSW region - 07/06/2018

The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.63136 is cancelled at 1900 hrs 07/06/2018.

Manager NEM Real Time Operations
63136RESERVE NOTICE07/06/2018 05:47:51 PM

Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 7/06/2018

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 7/06/2018

An Actual LOR2 condition has been declared for the NSW region from 1730 hrs.

The Actual LOR2 condition is forecast to exist until 1900 hrs

The contingency capacity reserve required is 844 MW
The minimum reserve available is 490 MW

AEMO is seeking a market response.

Manager NEM Real Time Operations
63088RESERVE NOTICE05/06/2018 07:18:36 PM

Cancellation of Actual (LOR2) condition in the NSW region - 05/06/2018

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the NSW region - 05/06/2018

The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.63084 is cancelled at 1900 hrs 05/06/2018.

Manager NEM Real Time Operations
63084RESERVE NOTICE05/06/2018 06:27:48 PM

Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 5/06/2018

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region - 5/06/2018

An Actual LOR2 condition has been declared for the NSW region from 1820 hrs.

The Actual LOR2 condition is forecast to exist until 1900 hrs

The contingency capacity reserve required is 867 MW
The minimum reserve available is 538 MW

AEMO is seeking a market response.

Manager NEM Real Time Operations

60801RESERVE NOTICE18/01/2018 05:45:00 PM

Cancellation of the Actual (LOR2) condition in the VIC region - 18/01/2018

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Actual (LOR2) condition in the VIC region - 18/01/2018

The Actual LOR2 condition in the VIC Region advised in AEMO Electricity Market Notice No.60799 is cancelled at 1730 hrs 18/01/2018.

Manager NEM Real Time Operations

60799RESERVE NOTICE18/01/2018 05:05:48 PM

Actual Lack Of Reserve Level 2 (LOR2) in the VIC Region - Thursday, 18 January 2018

AEMO ELECTRICITY MARKET NOTICE
Actual Lack Of Reserve Level 2 (LOR2) in the VIC Region - Thursday, 18 January 2018

An Actual LOR2 condition has been declared for the VIC region from 1635 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs
The contingency capacity reserve required is 560 MW
The minimum reserve available is 383 MW
AEMO is seeking a market response.

Manager NEM Real Time Operations




57819RESERVE NOTICE03/03/2017 05:06:53 PM

Update Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17

AEMO ELECTRICITY MARKET NOTICE

Update Actual Lack Of Reserve Level 2 (LOR2) in the SA Region - 03/03/17

An Actual LOR2 condition has been declared for the SA region from 1503 hrs.

The Actual LOR2 condition is forecast to exist until 1800 hrs.

The contingency capacity reserve required is 250 MW

The minimum reserve available is 210 MW

AEMO is seeking a market response.


Manager NEM Real Time Operations