STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 18/05/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
1. From 0000 hrs to 0330 hrs 18/05/2023.
The forecast capacity reserve requirement is 460 MW.
The minimum capacity reserve available is 340 MW.
2. From 0700 hrs to 0830 hrs 18/05/2023.
The forecast capacity reserve requirement is 460 MW.
The minimum capacity reserve available is 398 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 17/05/2023
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 107818 has been updated at 1400 hrs 12/05/2023 to the following:
1. From 0630 hrs to 0900 hrs 17/05/2023.
The forecast capacity reserve requirement is 454 MW.
The minimum capacity reserve available is 328 MW.
2. From 1700 hrs to 1900 hrs 17/05/2023.
The forecast capacity reserve requirement is 454 MW.
The minimum capacity reserve available is 248 MW.
3. From 1930 hrs 17/05/2023 to 0000 hrs 18/05/2023.
The forecast capacity reserve requirement is 455 MW.
The minimum capacity reserve available is 249 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 17/05/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
From 1830 hrs to 1930 hrs 17/05/2023.
The forecast capacity reserve requirement is 454 MW.
The minimum capacity reserve available is 434 MW.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 10/05/2023
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 107810 is cancelled at 1010 hrs 10/05/2023.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 10/05/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1730 hrs 10/05/2023 to 1800 hrs 10/05/2023.
The forecast capacity reserve requirement is 1200 MW.
The minimum capacity reserve available is 1195 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 09/05/2023
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 107800 is cancelled at 1550 hrs 09/05/2023.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/05/2023
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 107790 is cancelled at 1400 hrs 09/05/2023.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/05/2023
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 107804 is cancelled at 1420 hrs 09/05/2023.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/05/2023
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
[1.] From 0700 hrs 10/05/2023 to 0730 hrs 10/05/2023.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 425 MW.
[2.] From 0830 hrs 10/05/2023 to 0900 hrs 10/05/2023.
The forecast capacity reserve requirement is 446 MW.
The minimum capacity reserve available is 349 MW.
Manager NEM Real Time Operations