PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/01/2022
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1800 hrs 18/01/2022 to 1900 hrs 18/01/2022.
The forecast capacity reserve requirement is 1096 MW.
The minimum capacity reserve available is 1026 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 17/01/2022
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1730 hrs 17/01/2022 to 1930 hrs 17/01/2022.
The forecast capacity reserve requirement is 971 MW.
The minimum capacity reserve available is 822 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region beginning on 16/01/2022
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 93843 is cancelled at 1800 hrs 15/01/2022.
No LOR1 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 17/01/2022
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 93842 is cancelled at 1800 hrs 15/01/2022.
No LOR1 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region beginning on 16/01/2022
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 93805 has been updated at 1400 hrs 13/01/2022 to the following:
1. From 1830 hrs to 1900 hrs on 16/01/2022.
The forecast capacity reserve requirement is 1012 MW.
The minimum capacity reserve available is 938 MW.
2. From 1730 hrs to 1930 hrs on 18/01/2022.
The forecast capacity reserve requirement is 1095 MW.
The minimum capacity reserve available is 827 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 17/01/2022
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 93804 has been updated at 1400 hrs 13/01/2022 to the following:
From 1700 hrs to 1930 hrs on 17/01/2022.
The forecast capacity reserve requirement is 1089 MW.
The minimum capacity reserve available is 673 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region beginning on 16/01/2022
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 93775 has been updated at 1400 hrs 12/01/2022 to the following:
1. From 1800 hrs to 1930 hrs 16/01/2022.
The forecast capacity reserve requirement is 1045 MW.
The minimum capacity reserve available is 832 MW.
2. From 1730 hrs to 1930 hrs 18/01/2022.
The forecast capacity reserve requirement is 1004 MW.
The minimum capacity reserve available is 695 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 17/01/2022
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 93774 has been updated at 1400 hrs 12/01/2022 to the following:
1. From 1630 hrs to 1730 hrs 17/01/2022.
The forecast capacity reserve requirement is 998 MW.
The minimum capacity reserve available is 609 MW.
2. From 1900 hrs to 2000 hrs 17/01/2022.
The forecast capacity reserve requirement is 942 MW.
The minimum capacity reserve available is 495 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region beginning on 16/01/2022
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:
1. From 1830 hrs to 1900 hrs 16/01/2022.
The forecast capacity reserve requirement is 1022 MW.
The minimum capacity reserve available is 1004 MW.
2. From 1830 hrs to 1900 hrs 18/01/2022.
The forecast capacity reserve requirement is 914 MW.
The minimum capacity reserve available is 860 MW.
AEMO Operations