Market Notices

101627RESERVE NOTICE12/09/2022 05:53:55 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 1900 hrs 12/09/2022 to 1930 hrs 12/09/2022.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 590 MW.


Manager NEM Real Time Operations
101626RESERVE NOTICE12/09/2022 05:20:02 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 101625 is cancelled at 1715 hrs 12/09/2022.

Manager NEM Real Time Operations
101625RESERVE NOTICE12/09/2022 03:50:29 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

[1.] From 1800 hrs 12/09/2022 to 1900 hrs 12/09/2022.
The forecast capacity reserve requirement is 1047 MW.
The minimum capacity reserve available is 997 MW.


Manager NEM Real Time Operations
101621RESERVE NOTICE12/09/2022 08:14:14 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 101614 is cancelled at 0715 hrs 12/09/2022.

Manager NEM Real Time Operations
101614RESERVE NOTICE11/09/2022 11:54:18 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

[1.] From 0700 hrs 12/09/2022 to 0800 hrs 12/09/2022.
The forecast capacity reserve requirement is 579 MW.
The minimum capacity reserve available is 539 MW.

[2.] From 1900 hrs 12/09/2022 to 1930 hrs 12/09/2022.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 589 MW.


Manager NEM Real Time Operations
101613RESERVE NOTICE11/09/2022 08:58:53 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 101608 is cancelled at 2100 hrs 11/09/2022.

Manager NEM Real Time Operations
101608RESERVE NOTICE11/09/2022 05:37:36 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/09/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 0730 hrs 12/09/2022 to 0800 hrs 12/09/2022.
The forecast capacity reserve requirement is 568 MW.
The minimum capacity reserve available is 552 MW.


Manager NEM Real Time Operations
101607RESERVE NOTICE11/09/2022 04:56:49 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 11/09/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 101602 has been updated at 1645 hrs to the following:

From 1730 hrs 11/09/2022 to 1930 hrs 11/09/2022.
The forecast capacity reserve requirement is 907 MW.
The minimum capacity reserve available is 729 MW.



Manager NEM Real Time Operations
101602RESERVE NOTICE11/09/2022 02:37:16 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 11/09/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

[1.] From 1730 hrs 11/09/2022 to 1830 hrs 11/09/2022.
The forecast capacity reserve requirement is 944 MW.
The minimum capacity reserve available is 917 MW.


Manager NEM Real Time Operations