54504RESERVE NOTICE14/07/2016 11:11:31 AM

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 14/07/16

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 14/07/16

AEMO declares a Forecast LOR1 condition for the SA Region.

From 1800 hrs to 1830 hrs 14/07/16

The contingency capacity reserve required is 440 MW

The minimum reserve available is 390 MW


Manager NEM Real Time Operations
54501RESERVE NOTICE14/07/2016 07:00:27 AM

Cancellation of Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 14 July 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Forecast (LOR1) condition in the SA region - PDPASA - 14/07/16

The Forecast LOR1 condition in the SA Region advised in AEMO Electricity Market Notice No. 54474 is cancelled at 0700 hrs 14/07/16.


Manager NEM Real Time Operations
54476RESERVE NOTICE13/07/2016 04:34:08 PM

Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the South Australia region advised in AEMO Electricity Market Notice No. 54440 is cancelled at 1600 hrs 13/07/2016.

Ashley Dunn
Operations Planning
54474RESERVE NOTICE13/07/2016 01:30:17 PM

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 14 July 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 14 July 2016

AEMO declares a Forecast LOR1 condition for the SA Region.

From 1730 hrs to 1830 hrs 14 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 221 MW


Manager NEM Real Time Operations
54451RESERVE NOTICE12/07/2016 04:31:49 PM

Update - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 13 July 2016

AEMO ELECTRICITY MARKET NOTICE

Update Forecast Lack of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 13 July 2016

See MN - 54449

AEMO declares the Forecast LOR1 condition for the SA Region.

From 1800 hrs to 2100 hrs 13 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 225 MW

Manager NEM Real Time Operations
54449RESERVE NOTICE12/07/2016 03:50:09 PM

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 12 July 2016 and 13 July 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 12 July 2016 and 13 July 2016

AEMO declares a Forecast LOR1 condition for the SA Region.

From 1800 hrs to 1900 hrs 12 July 2016 and
From 1830 hrs to 1900 hrs 13 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 312 MW


Manager NEM Real Time Operations
54440RESERVE NOTICE12/07/2016 03:03:13 PM

Update of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA - 15/07/2016

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the South Australia region advised in AEMO Electricity Market Notice No. 54397 has been updated at 1400hrs 12/07/2016 to the following:

From 15/07/2016 1800 hrs to 2030 hrs
The contingency capacity reserve required is 400 MW
The minimum reserve available is 290 MW

Ashley Dunn
Operations Planning
54435RESERVE NOTICE12/07/2016 01:00:00 PM

Forecast Lack of Reserve Level 1 (LOR1) in the xx Region - PDPASA - 13 July 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack of Reserve Level 1 (LOR1) in the SA Region - PDPASA - 13 July 2016

AEMO declares a Forecast LOR1 condition for the SA Region.

From 1800 hrs to 1830 hrs 13 July 2016

The contingency capacity reserve required is 400 MW

The minimum reserve available is 313 MW


Manager NEM Real Time Operations
54397RESERVE NOTICE11/07/2016 03:17:48 PM

Update of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the South Australia region - STPASA - 14/07/2016

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the South Australia region advised in AEMO Electricity Market Notice No. 54390 has been updated at 1400 hrs 11/07/2016 to the following:

From 14/07/2016 1800 hrs to 2130 hrs
The contingency capacity reserve required is 400 MW
The minimum reserve available is 230 MW