Market Notices

108766RESERVE NOTICE26/06/2023 07:20:37 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 26/06/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 26/06/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1900 hrs.

The Actual LOR1 condition is forecast to exist until 1930 hrs.

The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 594 MW.


Manager NEM Real Time Operations
108648RESERVE NOTICE21/06/2023 06:54:03 PM

Cancellation of Actual (LOR1) condition in the NSW region - 21/06/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 21/06/2023

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No. 108647 is cancelled at 1845 hrs.

Manager NEM Real Time Operations
108647RESERVE NOTICE21/06/2023 05:49:17 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 21/06/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 21/06/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1930 hrs.

The forecast capacity reserve requirement is 1613 MW.
The minimum capacity reserve available is 1453 MW.


Manager NEM Real Time Operations
108642RESERVE NOTICE20/06/2023 07:38:22 PM

Cancellation of Actual (LOR1) condition in the NSW region - 20/06/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 20/06/2023

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No. 108640 is cancelled at 1940 hrs.

Manager NEM Real Time Operations
108640RESERVE NOTICE20/06/2023 05:54:53 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 20/06/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 20/06/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1900 hrs.

The forecast capacity reserve requirement is 1631 MW.
The minimum capacity reserve available is 1564 MW.


Manager NEM Real Time Operations
108296RESERVE NOTICE30/05/2023 07:47:49 PM

Cancellation of Actual (LOR1) condition in the NSW region - 30/05/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 30/05/2023

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice 108287 is cancelled at 1945 hrs 30/05/2023

Manager NEM Real Time Operations
108295RESERVE NOTICE30/05/2023 06:22:59 PM

Cancellation of Actual (LOR1) condition in the QLD region - 30/05/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 30/05/2023

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice 108286 is cancelled at 1815 hrs 30/05/2023

Manager NEM Real Time Operations
108287RESERVE NOTICE30/05/2023 05:55:12 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/05/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 30/05/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1800 hrs.

The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1151 MW.


Manager NEM Real Time Operations
108286RESERVE NOTICE30/05/2023 05:56:03 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 30/05/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 30/05/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1800 hrs.

The forecast capacity reserve requirement is 991 MW.
The minimum capacity reserve available is 922 MW.