Filter by category
Filter by Date
Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 06 July 2016
Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 06 July 2016
An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs (or is not forecast in Pre Dispatch)
The contingency capacity reserve required is 400 MW
The minimum reserve available is 337 MW
Manager NEM Real Time Operations