[EventId:201611181630_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 18 November 2016 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 18 November 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 18 November 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1630 hrs on 18 November 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201611181525_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 18 November 2016 15:25
Issued by Australian Energy Market Operator Ltd at 1525 hrs on 18 November 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 18 November 2016.
Refer to market notice: 55774
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1525 hrs on 18 November 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201611181505_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 18 November 2016 15:05
Issued by Australian Energy Market Operator Ltd at 1505 hrs on 18 November 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 18 November 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1505 hrs on 18 November 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201611151630_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 15 November 2016 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 15 November 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 15 November 2016.
Refer to market notice: 55745
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1630 hrs on 15 November 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201611151530_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 15 November 2016 15:30
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 15 November 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 15 November 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1530 hrs on 15 November 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201611081645_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 November 2016 16:45
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 8 November 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 November 2016.
Refer to market notice: 55584
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1645 hrs on 8 November 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201611081525_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 November 2016 15:25
Issued by Australian Energy Market Operator Ltd at 1525 hrs on 8 November 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 November 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1525 hrs on 8 November 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201610040215_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 04 October 2016 02:15
Issued by Australian Energy Market Operator Ltd at 0215 hrs on 4 October 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 4 October 2016.
Refer to market notice: 55162
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 0215 hrs on 4 October 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201610040040_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 04 October 2016 00:40
Issued by Australian Energy Market Operator Ltd at 0040 hrs on 4 October 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 4 October 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0040 hrs on 4 October 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.