Filter by category
Filter by Date
[EventId:201612010530_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 01 December 2016 05:30
Issued by Australian Energy Market Operator Ltd at 0530 hrs on 1 December 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 1 December 2016.
Refer to market notice: 56008
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0530 hrs on 1 December 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201612010430_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 01 December 2016 04:30
Issued by Australian Energy Market Operator Ltd at 0430 hrs on 1 December 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 1 December 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0430 hrs on 1 December 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201612010400_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 01 December 2016 04:00
Issued by Australian Energy Market Operator Ltd at 0400 hrs on 1 December 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 1 December 2016.
Refer to market notice: 55984
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0400 hrs on 1 December 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201612010305_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 01 December 2016 03:05
Issued by Australian Energy Market Operator Ltd at 0305 hrs on 1 December 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 1 December 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0305 hrs on 1 December 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201612010120_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 01 December 2016 01:20
Issued by Australian Energy Market Operator Ltd at 0120 hrs on 1 December 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 1 December 2016.
Refer to market notice: 55959
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0120 hrs on 1 December 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201612010105_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 01 December 2016 01:05
Issued by Australian Energy Market Operator Ltd at 0105 hrs on 1 December 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 1 December 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0105 hrs on 1 December 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201611221530_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 22 November 2016 15:30
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 22 November 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 22 November 2016.
Refer to market notice: 55818
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1530 hrs on 22 November 2016.
This is an AEMO autogenerated Market Notice.
[EventId:201611221430_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 22 November 2016 14:30
Issued by Australian Energy Market Operator Ltd at 1430 hrs on 22 November 2016
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 22 November 2016.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1430 hrs on 22 November 2016.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:201611181645_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 18 November 2016 16:45
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 18 November 2016
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 18 November 2016.
Refer to market notice: 55776
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1645 hrs on 18 November 2016.
This is an AEMO autogenerated Market Notice.