Market Notices

54457SETTLEMENTS RESIDUE12/07/2016 07:00:23 PM

[EventId:201607121900_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 19:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1900 hrs on 12 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Refer to market notice: 54455

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1900 hrs on 12 July 2016.

This is an AEMO autogenerated Market Notice.
54455SETTLEMENTS RESIDUE12/07/2016 06:00:29 PM

[EventId:201607121800_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 12 July 2016 18:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1800 hrs on 12 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1800 hrs on 12 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54452SETTLEMENTS RESIDUE12/07/2016 04:30:19 PM

[EventId:201607121630_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 16:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 12 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Refer to market notice: 54442

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 1630 hrs on 12 July 2016.

This is an AEMO autogenerated Market Notice.
54442SETTLEMENTS RESIDUE12/07/2016 03:05:23 PM

[EventId:201607121505_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 12 July 2016 15:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1505 hrs on 12 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 1505 hrs on 12 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54409SETTLEMENTS RESIDUE12/07/2016 01:00:20 AM

[EventId:201607120100_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 12 July 2016 01:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0100 hrs on 12 July 2016

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 12 July 2016.

Refer to market notice: 54404

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.

The negative residue constraint NRM_SA1_VIC1 ceased operating at 0100 hrs on 12 July 2016.

This is an AEMO autogenerated Market Notice.
54404SETTLEMENTS RESIDUE11/07/2016 11:40:25 PM

[EventId:201607112340_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 11 July 2016 23:40

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2340 hrs on 11 July 2016

ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 11 July 2016.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.

The negative residue constraint set NRM_SA1_VIC1 commenced operating from 2340 hrs on 11 July 2016.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
54378RESERVE NOTICE08/07/2016 07:56:33 PM

Cancellation of the Actual (LOR1) condition in the SA region - 8/07/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 8/07/2016

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.54371 is cancelled at 2000 hrs 8/07/2016.


Manager NEM Real Time Operations
54371RESERVE NOTICE08/07/2016 06:35:57 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 08 July 2016

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 08 July 2016

Update to Market Notice 54370

An Actual LOR1 condition has been declared for the SA Region from 1830 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs

The contingency capacity reserve required is 400 MW

The reserve available is 343 MW

Manager NEM Real Time Operations
54352RESERVE NOTICE07/07/2016 09:53:00 PM

Cancellation of the Actual (LOR1) condition in the SA region - 7/07/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 7/07/2016

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.54306 is cancelled at 2130 hrs 7/07/2016.


Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm