Actual Lack Of Reserve Level 2 (LOR2) in the South Australia Region Wednesday, 8 February 2017
Actual Lack Of Reserve Level 2 (LOR2) in the South Australia Region Wednesday, 8 February 2017
An Actual LOR2 condition has been declared for the South Australia region from 1900 hrs.
The Actual LOR2 condition is forecast to exist until 2000 hrs
The contingency capacity reserve required is 200 MW
The minimum reserve available is 9 MW
AEMO does not intend to intervene through a AEMO intervention event.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the South Australia Region
Actual Lack Of Reserve Level 2 (LOR2) in the South Australia Region
An Actual LOR2 condition has been declared for the South Australia region from 1700 hrs.
The Actual LOR2 condition is forecast to exist until 1900 hrs
The contingency capacity reserve required is 200MW
The minimum reserve available is 114 MW
AEMO is seeking a market response.
AEMO does not intend to intervene through a AEMO intervention event.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.
Actual Lack Of Reserve Level 1 (LOR1) in the SA Region.
An Actual LOR1 condition has been declared for the SA Region.
From 1600 hrs to 1900 hrs 08/02/2017
The contingency capacity reserve required is 400 MW
The minimum reserve available is 236 MW
Manager NEM Real Time Operations
Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.
Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.
Refer AEMO Electricity market notice 57238
An Actual LOR1 condition has been declared for the NSW Region.
From 1330 hrs to 1730 hrs Monday, 6 February 2017
The contingency capacity reserve required is 1340 MW
The minimum reserve available is 768 MW
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region.
An Actual LOR1 condition has been declared for the NSW Region.
From 1330 hrs to 1700 hrs Monday, 6 February 2017
The contingency capacity reserve required is 1330 MW
The minimum reserve available is 1010 MW
Manager NEM Real Time Operations
Cancellation - Actual LOR2 South Australia Region - 23/1/2017
Cancellation - Actual LOR2 South Australia Region - 23/1/2017
Refer AEMO Electricity Market Notice 56983
An actual LOR2 condition has been cancelled for the South Australia region from 0730 hrs.
Manager NEM Real Time Operations
Actual LOR2 South Australia Region - 23/1/2017
Actual LOR2 South Australia Region - 23/1/2017
Refer AEMO Electricity Market Notice 56972.
An actual LOR2 condition has been declared for the South Australia region from 0508 hrs due to an unplanned outage of the APD - Heywood - Mortlake No.2 500k V Line in Victoria
If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.
There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 6/1/17
Correction to Market notice 56660 - should be type Market notice type Reserve Notice.
Cancellation of Actual (LOR1) condition in the South Australia region - 6/1/17
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No.56660 is cancelled at 1745 hrs 6/1/17.
Manager NEM Real Time Operations
Cancellation - Actual LOR2 South Australia Region - 23/12/2016
Cancellation - Actual LOR2 South Australia Region - 23/12/2016
Refer AEMO Electricity Market Notices 56398 and 56405
An actual LOR2 condition has been cancelled for the South Australia region from 1330 hrs
Manager NEM Real Time Operations