114629LOAD RESTORE13/02/2024 03:13:39 PM

Load Restoration Direction Cancellation in the Vic Region

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Load Restoration Direction in the Vic Region - 13/02/2024

Refer to AEMO Electricity Market Notice ID 114607
Load restoration as directed is complete. Direction cancelled from 1510 hrs 13/02/2024.

Manager NEM Real Time Operations
114627LOAD RESTORE13/02/2024 03:08:04 PM

Load Restoration Direction in the Vic Region

AEMO ELECTRICITY MARKET NOTICE

Load Restoration Direction in the Vic Region

AEMO has directed load restoration commencing at 1450 hrs 13/02/2024 in the Victoria region

The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.

Manager NEM Real Time Operations
114607LOAD SHED13/02/2024 02:35:06 PM

Load Shedding Direction in the Vic Region

AEMO ELECTRICITY MARKET NOTICE

Load Shedding Direction in the Vic Region

AEMO has directed load shedding commencing at 1420 hrs 13/02/2024
in the Victoria region to restore power system security.

The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.

Manager NEM Real Time Operations
113958RESERVE NOTICE29/01/2024 09:17:19 AM

STPASA - Suspect Lack Of Reserve Level 3 (LOR3) in the QLD Region on 01/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO considers that there are suspect Forecast LOR3 conditions for the QLD region for the following periods:

1. From 0900 hrs to 1000 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 38 MW at 0930 hrs.

2. From 1130 hrs to 1200 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 62 MW at 1130 hrs.

AEMO is currently investigating these LOR3 forecast conditions to confirm whether they are valid.

AEMO Operations
108751RESERVE NOTICE26/06/2023 10:49:35 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 27/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 108747 is cancelled at 1000 hrs 26/06/2023.

AEMO Operations
108747RESERVE NOTICE26/06/2023 05:41:37 AM

STPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 27/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 108740 has been updated at 0530 hrs to the following:

From 1800 hrs 27/06/2023 to 1930 hrs 27/06/2023.
The maximum load (other than interruptible loads) forecast to be interrupted is 43 MW at 1830 hrs.
.
AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 27/06/2023.

Manager NEM Real Time Operations
108740RESERVE NOTICE25/06/2023 10:44:08 PM

STPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 27/06/2023

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 1800 hrs 27/06/2023 to 1900 hrs 27/06/2023.
The maximum load (other than interruptible loads) forecast to be interrupted is 5 MW at 1830 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 27/06/2023.

Manager NEM Real Time Operations
108729RESERVE NOTICE25/06/2023 08:28:49 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 27/06/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 108727 is cancelled at 0800 hrs 25/06/2023.

Manager NEM Real Time Operations
108727RESERVE NOTICE24/06/2023 10:47:54 PM

STPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region on 27/06/2023

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 1800 hrs 27/06/2023 to 2000 hrs 27/06/2023.
The maximum load (other than interruptible loads) forecast to be interrupted is 108 MW at 1830 hrs.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 27/06/2023.

Manager NEM Real Time Operations