58397INTER-REGIONAL TRANSFER18/04/2017 02:38:51 PM

Inter-Regional Transfer Limit Variation - Directlink - NSW Region - 18/04/17

AEMO ELECTRICITY MARKET NOTICE

At 1412 hrs AEMO was informed Directlink DC1 Leg is unable to transfer power.

The following constraint set was invoked at 1435 hrs 18/04/17.

N-X_MBTE_2

This constraint set contains equations with the following interconnector on the left hand side.

N-Q-MNSP1

Manager NEM Real Time Operations
58394INTER-REGIONAL TRANSFER18/04/2017 11:24:48 AM

Inter-regional transfer limit variation - Moorabool - Mortlake 500 kV Line - Vic Region - 18/04/17

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Moorabool - Mortlake 500 kV Line - Vic Region - 18/04/17

At 1110 hrs there was an unplanned outage of the Moorabool - Mortlake 500 kV Line in the Vic region.

The following constraint sets were invoked at 1120 hrs 18/04/17.

F-V-MLMO
S-X_BC_CP
V-MLMO

The constraint sets contain equations the following interconnectors on the LHS

T-V-MNSP1
V-SA
V-S-MNSP1
VIC1-NSW1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
58366INTER-REGIONAL TRANSFER09/04/2017 04:31:07 PM

Cancellation Inter-Regional Transfer limit variation Terranora

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation Terranora
The power flow on the Terranora interconnector is following the value determined by the NEM dispatch algorithm.
The Constraint Set I-CTRL_ISSUE_TE has been revoked from 1620 hrs

Manager NEM Real Time Operations
58365INTER-REGIONAL TRANSFER09/04/2017 03:40:01 PM

Inter-Regional Transfer limit variation Terranora

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation Terranora
The power flow on the Terranora interconnector is not following the value determined by the NEM dispatch algorithm.
The Constraint Set I-CTRL_ISSUE_TE has been invoked from 1520 hrs until further notice.
This Constraint Set contains an equation with the following interconnector on the LHS.
N-Q-MNSP1

Manager NEM Real Time Operations
58360INTER-REGIONAL TRANSFER09/04/2017 06:21:01 AM

Cancellation - Inter-Regional Transfer limit variation : Basslink

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-Regional Transfer limit variation : Basslink

At 0423 hrs 9 April Basslink returned to service

Constraint set I-BL_ZERO revoked at 0620 hrs


Manager NEM Real Time Operations
58359INTER-REGIONAL TRANSFER09/04/2017 04:30:41 AM

Inter-Regional Transfer limit variation : Basslink

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation : Basslink

At 0423 hrs 9 April 2017 the Basslink interconnector tripped.

Constraint set I-BL_ZERO invoked at 0430 hrs

This constraint set limits Basslink flow to 0 MW in either direction.

Manager NEM Real Time Operations
58354INTER-REGIONAL TRANSFER09/04/2017 12:10:05 AM

Cancellation - Inter-Regional Transfer limit variation - Vic Region - 8 April 2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Inter-Regional Transfer limit variation - Vic Region - 8 April 2017

Refer to MN 58352

Dederang - Glenrowan No 3 220 kV Line in the Vic region returned to service at 2349 hrs.

Constraint set V-DDGN was revoked at 0000 hrs 9/4/2017

The constraint has the following interconnectors on the left hand side.

V-S-MNSP1
VIC1-NSW1
V-SA

Manager NEM Real Time Operations
58352INTER-REGIONAL TRANSFER08/04/2017 11:33:19 PM

Inter-Regional Transfer limit variation - Vic Region - 8 April 2017

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Vic Region - 8 April 2017

An unplanned outage of the Dederang - Glenrowan No 3 220 kV Line in the Vic region occured at 2321 hrs.

Constraint set V-DDGN has been invoked from 2330 hrs until further notice

The constraint has the following interconnectors on the left hand side.

V-S-MNSP1
VIC1-NSW1
V-SA

Manager NEM Real Time Operations
58348INTER-REGIONAL TRANSFER08/04/2017 05:27:35 PM

Inter-regional transfer limit variation - Kemps Creek - Sydney North No. 14 330 kV Line - NSW Region - 8/04/17

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Kemps Creek - Sydney North No. 14 330 kV Line - NSW Region - 8/04/17

A planned outage of the Kemps Creek - Sydney North No. 14 330 kV Line in the NSW region was scheduled to be completed at 1700 hrs on 9/04/17.

The outage has been return to service early.

The following constraint set was revoked at 1715 hrs 8/04/17.

N-KCSN_14

The constraint set contains equations the following interconnectors on the LHS

N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations