Cancellation - Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control
Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control - Monday, 16 May 2016
Refer to MN 53307
The Greenbank to Middle Ridge (8849) 275kV Line was returned to service.
The following constraint set was revoked at 0530 hrs until further notice.
Q-MRGB_8848_8849
The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1
Manager NEM Real Time Operations
Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control
Cancellation -Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - Monday, 16 May 2016
Refer MN 53308
The Tarong to South Pine (832) 275kV Line has been returned to service.
The following constraint set was revoked at 0520 hrs..
Q-TRSP_832
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control
Inter-regional transfer limit variation - Tarong to South Pine (832) 275kV Line (Qld) - Voltage Control - Monday, 16 May 2016
The Tarong to South Pine (832) 275kV Line has been de-energised to manage voltages in the Qld region.
The following constraint set was invoked at 0120 hrs until further notice.
Q-TRSP_832
The constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control
Inter-regional transfer limit variation - Greenbank to Middle Ridge (8849) 275kV Line (Qld) - Voltage Control - Monday, 16 May 2016
The Greenbank to Middle Ridge (8849) 275kV Line has been de-energised to manage voltages in the Qld region.
The following constraint set was invoked at 0015 hrs until further notice.
Q-MRGB_8848_8849
The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 53254
There is no longer any lightning activity has ceased in the vicinity of the the Farrell - Reece No. 1 and No. 2 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1215 hrs.
Constraint Sets F-T-FARE_N-2 revoked.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 53253
There is no longer any lightning activity in the vicinity of the Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1215 hrs.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220 kV Lines in Tasmania due to Lightning.
Lightning is occurring near the Farrell- Reece No. 1 and No. 2 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1100
hrs 15 May 2015 until further notice.
Constraint Set F-T-FARE_N-2 invoked.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Reclassification of a Non-Credible Contingency Event: Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line in Tasmania due to Lightning.
Lightning is occurring near the Farrell - John Butters 220 kV Line and the Farrell - Rosebery Tee Queenstown - Newton 110 kV Line.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1030 hrs 15 May 2016 until further notice.
Manager NEM Real Time Operations
Cancellation - Inter-regional Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275kV Line (Qld) - Voltage Control - 15 May 2016
Cancellation - Inter-regional transfer limit variation - Greenbank to Middle Ridge (8848) 275kV Line (Qld) - Voltage Control - 15May 2016
Refer to MN 53248
The Greenbank to Middle Ridge (8848) 275kV Line was returned to service.
The following constraint set was revoked at 0800 hrs
Q-MRGB_8848_8849
The constraint set contains equations with the following interconnectors on the LHS.
NSW-QLD1
N-Q-MNSP1
Refer to AEMO Network Outage Schedule for further details.
Manager NEM Real Time Operations