Cancellation - Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
Cancellation - Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
The AEMO Dynamic Stability Analysis application is indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region. The following constraint set has been invoked to apply offset reduction to the Victoria transient stability export limit.
Constraint V-DSA_STAB-50 invoked from 0155 hrs to 0220 hrs.
Constraint V-DSA_STAB-100 invoked from 0220 hrs to 0240 hrs.
Constraint V-DSA_STAB-150 invoked from 0240 hrs to 0500 hrs.
Constraint V-DSA_STAB-100 invoked from 0500 hrs to 0600 hrs
Constraints have the following interconnectors on the LHS
NSW1-QLD1
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1-NSW1
Manager NEM Real Time Operations
Update - Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
Update - Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
The AEMO Dynamic Stability Analysis application is indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region. The following constraint set has been invoked to apply offset reduction to the Victoria transient stability export limit.
Constraint V-DSA_STAB-50 invoked from 0155 hrs to 0220 hrs.
Constraint V-DSA_STAB-100 invoked from 0220 hrs to 0240 hrs.
Constraint V-DSA_STAB-150 invoked from 0240 hrs to 0500 hrs.
Constraint V-DSA_STAB-100 invoked from 0500 hrs until further notice.
Constraints have the following interconnectors on the LHS
NSW1-QLD1
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1-NSW1
Manager NEM Real Time Operations
Update - Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
Update - Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
The AEMO Dynamic Stability Analysis application is indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region. The following constraint set has been invoked to apply offset reduction to the Victoria transient stability export limit.
Constraint V-DSA_STAB-50 invoked from 0155 hrs to 0220 hrs.
Constraint V-DSA_STAB-100 invoked from 0220 hrs to 0240 hrs.
Constraint V-DSA_STAB-150 invoked from 0240 hrs until further notice.
Constraints have the following interconnectors on the LHS
NSW1-QLD1
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
The AEMO Dynamic Stability Analysis application is indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region. The following constraint set has been invoked to apply offset reduction to the Victoria transient stability export limit.
Constraint V-DSA_STAB-50 invoked from 0155 hrs to 0220 hrs.
Constraint V-DSA_STAB-100 invoked from 0220 hrs until further notice.
Constraints have the following interconnectors on the LHS
NSW1-QLD1
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
Inter-regional transfer limit variation for Transient Stability Limit Victoria Region 29 May 2016
The AEMO Dynamic Stability Analysis application is indicating violations for a fault on a Hazelwood - South Morang 500 kV transmission line in the Victoria region. The following constraint set has been invoked to apply offset reduction to the Victoria transient stability export limit.
Constraint V-DSA_STAB-50 invoked from 0155 hrs until further notice.
Constraints have the following interconnectors on the LHS
NSW1-QLD1
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1-NSW1
Manager NEM Real Time Operations
Update - Non-credible contingency event - SA region - 26/05/2016
Update - Non-credible contingency event - SA region - 26/05/2016
Update to Market Notice 53526
At 0851 hrs the South East - Tailem Bend No. 1 275 kV Line and the South East No. 1 275 kV SVC tripped.
At 0930 hrs the South East - Tailem Bend No. 1 275 kV Line was returned to service
At 1617 hrs the South East No. 1 275 kV SVC was returned to service
The following Constraint Sets were revoked at 1630 hrs.
S-SE_VC_1
V-2RP
See the AEMO Network Outage Scheduler (NOS) for further information
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Update - Interregional Transfer Limit variation, South Australia Region Wednesday 26 May 2016
Interregional Transfer Limit Variation, South Australia Region Wednesday 26 May 2016
Update to Market Notice 53525
At 0930 hrs South East - Tailem Bend No.1 275 kV Line returned to service. The South East No.1 275 kV SVC remains out of service.
The following Constraint Set was revoked at 0945 hrs.
S-TBSE
See the AEMO Network Outage Scheduler (NOS) for further information
Manager NEM Real Time Operations
Non-credible contingency event - SA region - 26/05/2016
Non-credible contingency event - SA region - 26/05/2016
At 0851 hrs the South East Tailem Bend No. 1 275 kV Line and the South East No. 1 275 kV SVC tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Interregional Transfer Limit variation, South Australia Region Wednesday 26 May 2016
Interregional Transfer Limit Variation, South Australia Region Wednesday 26 May 2016
At 0851 hrs, in the South Australia region the Tailem Bend to South East No.1 Line tripped in conjunction with the No.1 South East SVC.
Refer to Market Notice 53526
The following Constraint Sets have been invoked
S-TBSE at 0900 hrs
V-2RP at 0905 hrs
S-SE_VC_1 at 0905 hrs
These Constraint Sets contain equations with the following interconnector on the LHS
NSW1-QLD1
V-S-MNSP1
V-SA
VIC1-NSW1
T-V-MNSP1
See the AEMO Network Outage Scheduler (NOS) for further information
Manager NEM Real Time Operations