115296INTER-REGIONAL TRANSFER28/02/2024 03:25:40 PM

Inter-regional transfer limit variation - 275kV South Pine SVC - QLD region - 28/02/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation -275kV South Pine SVC - QLD region - 28/02/2024

At 1425 hrs 28/02/2024 there was an unplanned outage of 275kV South Pine SVC.

Constraint set Q-SP_VC invoked from 1435 hrs.

The constraint set contains equations with the following interconnector on the LHS:

N-Q-MNSP1
NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
115292RESERVE NOTICE28/02/2024 03:15:54 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115212 is cancelled at 1400 hrs 28/02/2024.

No LOR condition is currently forecast in the QLD region in the STPASA period.

AEMO Operations
115291RESERVE NOTICE28/02/2024 01:51:53 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:

[1.] From 1530 hrs 29/02/2024 to 1600 hrs 29/02/2024.
The forecast capacity reserve requirement is 1360 MW.
The minimum capacity reserve available is 1162 MW.


Manager NEM Real Time Operations
115256INTER-REGIONAL TRANSFER28/02/2024 11:02:16 AM

Inter-regional transfer limit variation - constraint automation to manage Power System Security in VIC region - 28/02/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - constraint automation to manage Power System Security in VIC region - 28/02/2024

In order to maintain the power system in a secure operating state in the VIC region, AEMO has invoked automated constraint set CA_SYDS_54F10C1F from 1035 hrs until further notice.

This constraint set contains equations with the following interconnector on the LHS;

V-S_MNSP1
V-SA
VIC1-NSW1

Refer to AEMO Network Outage Scheduler (NOS) for further information.

Manager NEM Real Time Operations
115213RESERVE NOTICE27/02/2024 03:02:19 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115147 has been updated at 1400 hrs 27/02/2024 to the following:

From 2130 hrs to 2200 hrs 29/02/2024.
The forecast capacity reserve requirement is 1735 MW.
The minimum capacity reserve available is 1636 MW.

AEMO Operations
115212RESERVE NOTICE27/02/2024 02:59:57 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115145 has been updated at 1400 hrs 27/02/2024 to the following:

1. From 1700 hrs to 1730 hrs 29/02/2024.
The forecast capacity reserve requirement is 1257 MW.
The minimum capacity reserve available is 968 MW.

2. From 2000 hrs to 2030 hrs 29/02/2024.
The forecast capacity reserve requirement is 1267 MW.
The minimum capacity reserve available is 923 MW.

AEMO Operations
115152RESERVE NOTICE26/02/2024 04:19:36 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 26/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115148 has been updated at 1615 hrs to the following:

[1.] From 1800 hrs 26/02/2024 to 1900 hrs 26/02/2024.
The forecast capacity reserve requirement is 1155 MW.
The minimum capacity reserve available is 827 MW.

Manager NEM Real Time Operations
115148RESERVE NOTICE26/02/2024 02:47:47 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 26/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:

[1.] From 1800 hrs 26/02/2024 to 1900 hrs 26/02/2024.
The forecast capacity reserve requirement is 1124 MW.
The minimum capacity reserve available is 974 MW.


Manager NEM Real Time Operations
115147RESERVE NOTICE26/02/2024 03:24:09 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115113 has been updated at 1400 hrs 26/02/2024 to the following:

1. From 1430 hrs to 1630 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 685 MW.

2. From 1930 hrs to 2130 hrs 29/02/2024.
The forecast capacity reserve requirement is 1735 MW.
The minimum capacity reserve available is 1050 MW.

AEMO Operations