103857GENERAL NOTICE21/11/2022 04:54:54 PM

QNI Minor testing 21 November 2022 - Update

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 103806

There is a further opportunity for testing QNI Minor for flows from NSW to Qld on Monday 21st November. The test timeframe has been extended to 2100hrs (from the previous 1700hrs).

The test timeframe is now 1145-2100hrs.

Ben Blake
AEMO Operations
103856GENERAL NOTICE21/11/2022 04:37:39 PM

Variation to FCAS Raise regulation requirements for Tas Region - 21/11/2022.

AEMO ELECTRICITY MARKET NOTICE

Variation to FCAS Raise regulation requirements for Tas Region - 21/11/2022.

The FCAS Raise regulation requirement was increased to manage time error to within standards.

The following constraint was invoked to increase the raise regulation requirements being dispatched

#RR_20221121162834 invoked from 1635 hrs.

Manager NEM Real Time Operations
103806GENERAL NOTICE21/11/2022 11:33:12 AM

QNI Minor testing 21 November 2022

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 102135

There is an opportunity for testing QNI Minor for flows from NSW to Qld on Monday 21st November from 1145-1700hrs.

This test includes a trip and reclose of a line in northern NSW.

Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade

Ben Blake
AEMO Operations
103655GENERAL NOTICE18/11/2022 09:01:44 PM

Update - DPV Contingency 1 (DPVC1) in the SA Region on 19/11/2022

AEMO ELECTRICITY MARKET NOTICE

Refer to MN 103649

AEMO has detected there is an elevated risk of the contingent disconnection of Distributed PV (DPV) with the loss of scheduled generation exceeding secure thresholds in the South Australia region from 0830 hrs 19/11/2022 to 1600 hrs 19/11/2022. The maximum forecast DPV contingency is 197 MW at 1200 hrs and the DPV contingency direction trigger is 78 MW.

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in South Australia. This may result in action such as the direction of scheduled generation, curtailment of non-scheduled wind generation, and/or an instruction to maintain DPV generation below a secure DPV generation threshold.

AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 0730 hrs on 19/11/2022

Manager NEM Real Time Operations
103649GENERAL NOTICE18/11/2022 05:12:51 PM

Update - DPV Contingency 1 (DPVC1) in the SA Region on 19/11/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected there is an elevated risk of the contingent disconnection of Distributed PV (DPV) with the loss of scheduled generation exceeding secure thresholds in the South Australia region from 1030 hrs 19/11/2022 to 1630 hrs 19/11/2022. The maximum forecast DPV contingency is 208 MW at 1300 hrs and the DPV contingency direction trigger is 78 MW.

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in South Australia. This may result in action such as the direction of scheduled generation, curtailment of non-scheduled wind generation, and/or an instruction to maintain DPV generation below a secure DPV generation threshold.

AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 0900 hrs on 19/11/2022

Manager NEM Real Time Operations
103347GENERAL NOTICE16/11/2022 10:52:47 PM

Update - DPV Contingency 1 (DPVC1) in the SA Region on 17/11/2022

AEMO ELECTRICITY MARKET NOTICE

Update to Market Notice 103337

AEMO has detected there is an elevated risk of the contingent disconnection of Distributed PV (DPV) with the loss of scheduled generation exceeding secure thresholds in the South Australia region from 0900 hrs 17/11/2022 to 1630 hrs 17/11/2022. The maximum forecast DPV contingency is 255 MW at 1230 hrs and the DPV contingency direction trigger is 78 MW.

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in South Australia. This may result in action such as the direction of scheduled generation, curtailment of non-scheduled wind generation, and/or an instruction to maintain DPV generation below a secure DPV generation threshold.

AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 0800 hrs on 17/11/2022

Manager NEM Real Time Operations
103338GENERAL NOTICE16/11/2022 05:24:47 PM

Cancellation of Distributed PV Contingency 3 (DPVC3), Distributed PV Contingency 2 (DPVC2) and Distributed PV Contingency 1 (DPVC1) condition in the SA Region on 16/11/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation - DPVC3, DPVC2 and DPVC1 - SA Region

Refer Market Notices 103261 for DPVC3, 103270 for DPVC2 and 103278 for DPVC1

The DPVC3, DPVC2 and DPVC1 conditions for 16/11/2022 are cancelled at 1630 hrs 16/11/2022.

Manager NEM Real Time Operations
103337GENERAL NOTICE16/11/2022 05:18:33 PM

DPV Contingency 1 (DPVC1) in the SA Region on 17/11/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected there is an elevated risk of the contingent disconnection of Distributed PV (DPV) with the loss of scheduled generation exceeding secure thresholds in the South Australia region from 0900 hrs 17/11/2022 to 1800 hrs 17/11/2022. The maximum forecast DPV contingency is 298 MW at 1230 hrs and the DPV contingency direction trigger is 36 MW.

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in South Australia. This may result in action such as the direction of scheduled generation, curtailment of non-scheduled wind generation, and/or an instruction to maintain DPV generation below a secure DPV generation threshold.

AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 0730 hrs on 17/11/2022

Manager NEM Real Time Operations
103278GENERAL NOTICE16/11/2022 10:10:54 AM

Distributed PV Contingency 3 (DPVC3) in the SA Region on 16/11/2022

AEMO ELECTRICITY MARKET NOTICE

Distributed PV curtailment is occurring in the SA region to maintain system security due to a Distributed PV Contingency condition.

The instruction to maintain demand above the required threshold is expected to end at 1700 hrs 16/11/2022


Manager NEM Real Time Operations