Brisbane Communication Issues - 27th May 2016
Brisbane Communication Issues - 27th May 2016
This is to advise that problems exist on the AEMO Brisbane Control Centre Phone system.
Participants who normally communicate with the Brisbane Control Centre are advised to utilise the backup telephone numbers or the alternative Sydney Control Centre contact numbers.
Further information will be provided when the problem is rectified.
Manager NEM Real Time Operations
Planned outages of Moorabool-Sydenham No.1 500 kV line and Sydenham-South Morang No.1 500 kV line - Victoria Region on 25 and 30 May 2016
Planned outages of Moorabool-Sydenham No.1 500 kV line and Sydenham-South Morang No.1 500 kV line - Victoria Region on 25 May and 30 May 2016.
There are planned outages of Moorabool-Sydenham No.1 500 kV line and Sydenham-South Morang No.1 500 kV line between 0630-1630hrs on 25 May 2016 and 0630-1800hrs on 30 May 2016.
During these outages, South Australia region remains connected to the NEM for the first contingency (trip of the Moorabool - Sydenham No.2 500 kV line). However, there is a potential risk of South Australia region separation from the rest of the NEM for the subsequent contingency following the first contingency.
AEMO will invoke the following FCAS regulation constraint sets after the first contingency during this outage to secure the power system in South Australia region.
F-S_LREG_0035
F-S_RREG_0035
Refer to AEMO Network Outage Schedule (NOS) for further details
Operations Planning
Update to planned outage at Tailem Bend - SA Region 17 May 2016
There is currently a planned outage of the Tailem Bend 275kV East Bus. Commencing at 0830 hrs 17/05/16, the outage is extended and will also offload the Tailem Bend - Cherry Gardens 275 kV line. During this outage, a trip of the Tailem Bend - Tunkilo 275 kV line severs the 275 kV connections between Victoria and South Australia regions. Should this contingency occur, AEMO will invoke the following FCAS regulation constraint sets.
F-S_LREG_0035
F-S_RREG_0035
For this contingency, the two regions remain connected by the 132 KV network but the next contingency will result in separation of Victoria and South Australia regions.
Refer to AEMO Network Outage Schedule (NOS) for further details