QNI minor testing 4th October 2023
Refer to market notice 109633
There is an opportunity for testing QNI Minor for flows from NSW to Qld up to 750 MW on Wednesday 4th October from 1700 to 2359hrs.
This test includes a trip and reclose of a line in northern NSW.
Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade
Ben Blake
AEMO Operations
Fast Frequency Response Market Start - 9th October 2023
AEMO has reviewed the capacity registered and committed for Very Fast FCAS market participation and has determined that both criteria have been met to commence market operations on Monday 9 October 2023 at 1300hrs AEST.
For information on the Fast Frequency Response (FFR) initiative please visit the website at: https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response
Ben Blake
AEMO Operations
NEM Local Temperature Alerts for SA from 28 Sep 2023 to 02 Oct 2023
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Port Augusta Ap (39+ Deg C): 2nd Oct
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
Network Augmentation Commissioned - SA Region - 26/09/2023
Network Augmentation Commissioned - SA Region - 26/09/2023
Commissioned: Para - Tungkillo No 2 275 kV Line
Manager NEM Real Time Operations
Network Augmentation Commissioned - SA Region - 15/09/2023
Network Augmentation Commissioned - SA Region - 15/09/2023
At Cherry Gardens, a new 275 kV Reactor connected to the South 275 kV Bus has been commissioned at 1035 hrs 15/09/2023.
Manager NEM Real Time Operations
Network Augmentation Commissioned/Decommissioned - SA Region - 07/09/2023
Network augmentation change in the SA region at 1730 hrs 07/09/2023 as follows:
Commissioned: Tungkillo - Robertstown No.2 275 kV Line
Decommissioned: Para - Robertstown 275 kV Line
Manager NEM Real Time Operations
QNI minor testing 5th September 2023
Refer to market notice 109448
There is an opportunity for testing QNI Minor for flows from NSW to Qld up to 750 MW on Saturday 5th September from 1000 to 1600hrs.
This test includes a trip and reclose of a line in northern NSW.
Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade
Ben Blake
AEMO Operations
Cancellation - Psymetrix PhasorPoint - Unplanned Outage - 04/09/2023
Cancellation - Psymetrix PhasorPoint - Unplanned Outage - 04/09/2023
Refer AEMO Electricity Market Notice 109602
AEMO Psymetrix PhasorPoint application has returned to service.
Constraint set I-OSC_STAB_MON revoked at 1940 hrs.
Manager NEM Real Time Operations
Psymetrix PhasorPoint - Unplanned Outage - 04/09/2023
Psymetrix PhasorPoint - Unplanned Outage - 04/09/2023
There is an unplanned outage of AEMO Psymetrix PhasorPoint application.
Constraint set I-OSC_STAB_MON invoked at 1830hrs 04/09/2023.
This constraint sets contain equations with the following interconnectors on the LHS.
NSW1-QLD1
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations