Market Notices

96681RECALL GEN CAPACITY31/05/2022 03:23:06 PM

Request for Generator Recall Information for 02/06/2022 for QLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 96668.

Please provide Generator Recall Information for 02/06/2022 by 1400 hrs AEST on 01/06/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

AEMO Operations
95690CONSTRAINTS01/04/2022 09:00:20 AM

Update to Vic to NSW transient stability limit

AEMO ELECTRICITY MARKET NOTICE

AEMO has completed a comprehensive review of the system normal transient stability limit for loss of a Hazelwood to South Morang 500 kV line for flows from Victoria to New South Wales. The revised limit takes into account a larger range of inertias, demands, interconnector flows and many different plants online. The revised limit is generally lower than the existing limit due to lower demands and inertias in the Victorian system since the last review back in 2016. However, it is expected the revised limit will normally be under-cut by the Victorian export voltage collapse limit for loss of all APD potlines.

The revised constraint equation includes generators in southern NSW and generation in Victoria on the left-hand side as well as interconnectors. Full details on the limits advice are to be published on 04/04/2022 on the AEMO website: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This revised limit will be implemented to the Victorian system normal constraint set V-NIL at 1000 hrs Tuesday 5th April 2022, with the following changes:

Constraint equations to remove:
- V::N_NIL_V
- V::N_NIL_S
- V::N_NIL_Q1
- V::N_NIL_Q2
Constraint equations to add:
- V::N_NIL_V1
- V::N_NIL_V2
- V::N_NIL_O1
- V::N_NIL_O2

These constraint equation changes have already been applied in AEMO's PreProduction systems.

For further details on the constraint equations please contact terry.liu@aemo.com.au

Terry Liu
AEMO Operations
94993MARKET SUSPENSION01/03/2022 06:43:18 PM

Declaration of electricity market resumption

AEMO ELECTRICITY MARKET NOTICE
Declaration of electricity market resumption

Refer initial AEMO Electricity Market Notice 94979

AEMO declares that the suspension of the spot market in Tasmania will end at 1915 hrs on 1 March 2022.


Relevant Market Notices issued under this suspension:
94979
Manager NEM Real Time Operations
94979MARKET SUSPENSION01/03/2022 12:39:12 PM

Declaration of electricity market suspension

AEMO ELECTRICITY MARKET NOTICE
Declaration of electricity market suspension
AEMO declares the spot market suspended in Tasmania with Market Suspension Schedule Pricing (refer NER clause 3.14.5(b)) from Trading Interval 1240 hrs on 1 March 2022 until further notice.
Dispatch prices for the first one or two dispatch intervals of this market suspension will be reviewed manually.
AEMO has determined that it has become impossible to operate the spot market in accordance with the provisions of the Rules due to Failure of SCADA systems.
Manager NEM Real Time Operation
94694MARKET SUSPENSION18/02/2022 03:38:41 PM

Declaration of electricity market resumption

AEMO ELECTRICITY MARKET NOTICE
Declaration of electricity market resumption

Refer initial AEMO Electricity Market Notice 94690

AEMO declares that the suspension of the spot market in South Australia will end at 1610 hrs on 18 February 2022.


Relevant Market Notices issued under this suspension:
94690
Manager NEM Real Time Operations
94690MARKET SUSPENSION18/02/2022 02:21:34 PM

Declaration of electricity market suspension

AEMO ELECTRICITY MARKET NOTICE
Declaration of electricity market suspension
AEMO declares the spot market suspended in South Australia with Market Suspension Schedule Pricing (refer NER clause 3.14.5(b)) from Trading Interval 1425 hrs on 18 February 2022 until further notice.
Dispatch prices for the first one or two dispatch intervals of this market suspension will be reviewed manually.
AEMO ELECTRICITY MARKET NOTICE Declaration of electricity market suspension AEMO declares the spot market suspended in South Australia with Market Suspension Schedule Pricing (refer NER clause 3.14.5(b)) from Trading Interval 1420 hrs on 18 February 2022 until further notice. Dispatch prices for the first one or two dispatch intervals of this market suspension will be reviewed manually. Manager NEM Real Time Operation
Manager NEM Real Time Operation
94226RECALL GEN CAPACITY30/01/2022 06:50:14 PM

Request for Generator Recall Information for the period for 02/02/2022 for OLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 94225

Please provide Generator Recall Information for 02/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
94211RECALL GEN CAPACITY30/01/2022 11:15:30 AM

Update - Request for Generator Recall Information for the period for 01/02/2022 for QLD Region

AEMO ELECTRICITY MARKET NOTICE

Correction to external reference in AEMO Electricity Market Notice 94209. It should read Qld.

Refer to AEMO Electricity Market Notice 94205

Please provide Generator Recall Information for 01/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
94210RECALL GEN CAPACITY30/01/2022 10:54:33 AM

Request for Generator Recall Information for the period for 01/02/2022 for NSW Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 94208

Please provide Generator Recall Information for 01/02/2022 by 1200 hrs EST on 31/01/2022 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm