96927RESERVE NOTICE10/06/2022 07:11:48 PM

Cancellation of Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 10/06/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 10/06/2022

The Actual LOR2 Condition in the QLD Region advised in AEMO Electricity Market Notice No.96921 is cancelled at 1900 hrs 10/06/2022.

Manager NEM Real Time Operations
96921RESERVE NOTICE10/06/2022 06:21:22 PM

Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 10/06/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the QLD region - 10/06/2022

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1800 hrs.

The Actual LOR2 condition is forecast to exist until 1900 hrs.

The forecast capacity reserve requirement is 524 MW.
The minimum capacity reserve available is 311 MW.

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement an AEMO intervention event.

Manager NEM Real Time Operations
95690CONSTRAINTS01/04/2022 09:00:20 AM

Update to Vic to NSW transient stability limit

AEMO ELECTRICITY MARKET NOTICE

AEMO has completed a comprehensive review of the system normal transient stability limit for loss of a Hazelwood to South Morang 500 kV line for flows from Victoria to New South Wales. The revised limit takes into account a larger range of inertias, demands, interconnector flows and many different plants online. The revised limit is generally lower than the existing limit due to lower demands and inertias in the Victorian system since the last review back in 2016. However, it is expected the revised limit will normally be under-cut by the Victorian export voltage collapse limit for loss of all APD potlines.

The revised constraint equation includes generators in southern NSW and generation in Victoria on the left-hand side as well as interconnectors. Full details on the limits advice are to be published on 04/04/2022 on the AEMO website: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This revised limit will be implemented to the Victorian system normal constraint set V-NIL at 1000 hrs Tuesday 5th April 2022, with the following changes:

Constraint equations to remove:
- V::N_NIL_V
- V::N_NIL_S
- V::N_NIL_Q1
- V::N_NIL_Q2
Constraint equations to add:
- V::N_NIL_V1
- V::N_NIL_V2
- V::N_NIL_O1
- V::N_NIL_O2

These constraint equation changes have already been applied in AEMO's PreProduction systems.

For further details on the constraint equations please contact terry.liu@aemo.com.au

Terry Liu
AEMO Operations
95169RESERVE NOTICE08/03/2022 07:32:53 PM

Cancellation of Actual (LOR2) in the QLD region - 08/03/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) in the QLD region - 08/03/2022

The Actual LOR2 Condition in the QLD Region advised in AEMO Electricity Market Notice No. 95166 is cancelled at 1930 hrs 08/03/2022.

Manager NEM Real Time Operations
95166RESERVE NOTICE08/03/2022 05:43:22 PM

Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 08/03/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the QLD region - 08/03/2022

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.

The Actual LOR2 condition is forecast to exist until 1900 hrs.

The forecast capacity reserve requirement is 443 MW.
The minimum capacity reserve available is 314 MW.

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement an AEMO intervention event.

Manager NEM Real Time Operations
94406RESERVE NOTICE01/02/2022 07:59:09 PM

Cancellation of Actual (LOR2) condition in the QLD region - 01/02/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the QLD region - 01/02/2022

The Actual LOR2 Condition in the QLD Region advised in AEMO Electricity Market Notice No.94395 is cancelled at 2000 hrs 01/02/2022.

Manager NEM Real Time Operations
94395RESERVE NOTICE01/02/2022 05:38:32 PM

Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 01/02/2022

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the QLD region - 01/02/2022

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1700 hrs.

The forecast capacity reserve requirement is 443 MW.
The minimum capacity reserve available is 77 MW.

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement an AEMO intervention event.

Manager NEM Real Time Operations
93862CONSTRAINTS14/01/2022 04:02:41 PM

Updated generator combinations for SA

AEMO MARKET NOTICE

Refer to market notice 92769

AEMO has published new generator combinations for South Australia:
- 1 for four synchronous condenser operation
- 9 for two synchronous condenser operation

Details on the new combinations and conditions for their use is in the updated limits advice (which was published earlier today):
https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

For further details please contact ben.blake@aemo.com.au

Ben Blake
AEMO Operations
93841CONSTRAINTS13/01/2022 01:22:58 PM

Update to System strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 89836

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of Haughton syncon, the system normal equations have been revised.

A revision to the constraint equations will be implemented at 0900hrs on Friday 14th January 2022.

The new combinations have now published in a limits advice document on AEMO's website: For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This advice contains all the combinations for Queensland for system normal cases.

The constraint equation in the Q-NIL set of the form below will be modified:

Q_NIL_STRGTH_CLRSF
Q_NIL_STRGTH_COLSF
Q_NIL_STRGTH_DAYSF
Q_NIL_STRGTH_HAMSF
Q_NIL_STRGTH_HAUSF
Q_NIL_STRGTH_HAYSF
Q_NIL_STRGTH_KEP
Q_NIL_STRGTH_KIDSF
Q_NIL_STRGTH_MEWF
Q_NIL_STRGTH_RUGSF
Q_NIL_STRGTH_RRSF
Q_NIL_STRGTH_SMSF
Q_NIL_STRGTH_WHTSF


For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au