55615RESERVE NOTICE09/11/2016 08:23:15 PM

Cancellation - Actual LOR2 South Australia Region - 09 Nov 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Actual LOR2 South Australia Region - 09 Nov 2016

Refer AEMO Electricity Market Notice 55577

The Actual LOR2 condition in the South Australia Region is cancelled at 2010 hrs 09 Nov 2016

Manager NEM Real Time Operations
55612ADMINISTERED PRICE CAP09/11/2016 06:30:10 PM

[EventId:93] AP STARTED for market ancillary services in SA at 09 November 2016 18:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1830 hrs on 9 November 2016

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped market ancillary Raise Reg services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $210,100.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 1835 hrs on 9 Nov 2016 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.

An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
55577RESERVE NOTICE08/11/2016 06:28:49 AM

Actual LOR2 South Australia Region - 8/11/2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 8/11/2016

An actual LOR2 condition has been declared for the South Australia region from 0600 hrs and is forecast to continue until further notice during the following planned outages detailed below:

[1] Heywood No.2 500 kV busbar from 0600 hrs 08/11/2016 to 1600 hrs 09/11/2016.
[2] Heywood to Mortlake 500 kV transmission line from 0600 hrs to 1600 hrs daily on 08/11/2016 and 09/11/2016.

If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.

Manager NEM Real Time Operations
55457RESERVE NOTICE22/10/2016 10:53:26 AM

Cancellation of the Actual (LOR2) condition in the SA region - 22 Oct 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Actual (LOR2) condition in the SA region - 22 Oct 2016

Refer to AEMO Electricity Market Notice No. 55445

The Actual LOR2 condition in the South Australia Region is cancelled at 1050 hrs 22 Oct 2016


Manager NEM Real Time Operations
55445RESERVE NOTICE20/10/2016 08:59:40 PM

Actual LOR2 South Australia Region - Thursday, 20 October 2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - Thursday, 20 October 2016

An actual LOR2 condition has been declared for the South Australia region from 2050 hrs and is forecast to continue until further notice during a planned outage of Heywood to South East No.2 275 kV transmission line between the Victoria and South Australia regions.

If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.

Manager NEM Real Time Operations




55434RESERVE NOTICE20/10/2016 06:15:35 AM

Cancellation of the Actual (LOR2) condition in the SA region - 20 Oct 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Actual (LOR2) condition in the SA region - 20 Oct 2016

Refer to AEMO Electricity Market Notice No. 55424

The Actual LOR2 condition in the South Australia Region is cancelled at 0610 hrs 20 Oct 2016


Manager NEM Real Time Operations

55424RESERVE NOTICE19/10/2016 07:03:09 AM

Update - Actual LOR2 South Australia Region - 19 Oct 2016

AEMO ELECTRICITY MARKET NOTICE

Update - Actual LOR2 South Australia Region - 19 Oct 2016

Refer AEMO Electricity Market Notice 55389

An actual LOR2 condition has been declared for the South Australia region from 1745 hrs 18 Oct 2016 and is forecast to continue until further notice during a planned outage of Heywood to South East No.2 275 kV transmission line between the Victoria and South Australia regions.

If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.

Manager NEM Real Time Operations
55418RESERVE NOTICE18/10/2016 05:51:15 PM

Actual LOR2 South Australia Region - 18 October 2016

AEMO ELECTRICITY MARKET NOTICE

Actual LOR2 South Australia Region - 18 October 2016
Refer AEMO Electricity Market Notice 55389
An actual LOR2 condition has been declared for the South Australia region from 1745 hrs and is forecast to continue until further notice during a planned outage of Heywood to South East No.2 275 kV transmission line between the Victoria and South Australia regions.

If a credible contingency event occurs in this period the South Australia region would separate from the rest of the NEM and is likely to result in interruptions to power supplies.

There are sufficient capacity reserves in the South Australia region to meet electricity demand but it may not be possible to bring the required additional capacity into service in time to avoid automatic under-frequency load shedding causing power interruptions.

Manager NEM Real Time Operations
55409RESERVE NOTICE18/10/2016 10:31:59 AM

Cancellation of the Actual (LOR2) condition in the South Australia region - 18 October 2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Actual (LOR2) condition in the South Australia region- 18 October 2016

Refer to AEMO Electricity Market Notice No. 55407

The Actual LOR2 condition in the South Australia Region is cancelled at 1030 hrs 18 October 2016

Manager NEM Real Time Operations