Market Notices

54371RESERVE NOTICE08/07/2016 06:35:57 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 08 July 2016

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 08 July 2016

Update to Market Notice 54370

An Actual LOR1 condition has been declared for the SA Region from 1830 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs

The contingency capacity reserve required is 400 MW

The reserve available is 343 MW

Manager NEM Real Time Operations
54352RESERVE NOTICE07/07/2016 09:53:00 PM

Cancellation of the Actual (LOR1) condition in the SA region - 7/07/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 7/07/2016

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.54306 is cancelled at 2130 hrs 7/07/2016.


Manager NEM Real Time Operations
54306RESERVE NOTICE07/07/2016 06:12:30 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 07 July 2016

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 07 July 2016
An Actual LOR1 condition has been declared for the SA Region from 1815 hrs.

The Actual LOR1 condition is forecast to exist until 2130 hrs

The contingency capacity reserve required is 400 MW

The reserve available is 277 MW

Manager NEM Real Time Operations
54248RESERVE NOTICE06/07/2016 07:15:35 PM

Cancellation of the Actual (LOR1) condition in the SA region - 6/7/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 6/7/2016

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.54247 is cancelled at 1900 hrs 6/7/2016.


Manager NEM Real Time Operations
54247RESERVE NOTICE06/07/2016 06:15:46 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 06 July 2016

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA Region - 06 July 2016
An Actual LOR1 condition has been declared for the SA Region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 1930 hrs (or is not forecast in Pre Dispatch)

The contingency capacity reserve required is 400 MW

The minimum reserve available is 337 MW


Manager NEM Real Time Operations
54215INTER-REGIONAL TRANSFER04/07/2016 10:21:15 AM

Inter-regional transfer limit variation South Australia - 04 July 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation South Australia - 04 July 2016

A short notice outage of the Templers No.2 132 kV Transformer in the SA region has occurred at 0955 hrs.

The following constraint set has been invoked for this outage at 1005 hrs

S-X_TPRS+TPDR

The outage constraint set contains the following interconnector on the LHS

V-S-MNSP1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
54211INTER-REGIONAL TRANSFER03/07/2016 10:53:44 PM

Inter-regional transfer limit variation - Lismore SVC - NSW Region - Sun 3 July 2016

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Lismore SVC - NSW Region - Sun 3 July 2016

At 2247 hrs, an unplanned outage of the Lismore SVC occured.

The following constraint set was invoked from 2255 hrs.
N-LS_VC1

The constraint set contains equations with the following interconnectors on the LHS.

N-Q-MNSP1
NSW1_QLD1

See Network Outage Scheduler (NOS) for further details and return to service times.

Manager NEM Real Time Operations
54207INTER-REGIONAL TRANSFER03/07/2016 08:27:48 AM

Inter-regional transfer limit variation George Town - Sheffield No2 220kV line (TAS)

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation George Town - Sheffield No.2 220kV line (TAS).

An unplanned notice outage of the George Town - Sheffield No.2 220kV line (TAS) occurred at 0802 hrs Sunday, 3 July 2016.

Constraint Set T-GTSH invoked at 0810 hrs.

This Constraint Set contains an equation with the following interconnector on the LHS.

T-V-MNSP1

Refer to the Network Outage Schedule (NOS) for further details.


Power System Operations Manager
54190INTER-REGIONAL TRANSFER01/07/2016 07:05:46 PM

Inter-Regional Transfer Limit Variation New South Wales Region Friday, 1 July 2016 Directlink

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer Limit Variation New South Wales Region Friday, 1 July 2016 Directlink

An unplanned outage of the No 2 Leg of Directlink has occurred at 1859 hrs

See AEMO Network Outage Scheduler (NOS) for details.

The following constraint set is invoked for this outage from 1905 hrs

N-X_MBTE_2

The outage constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1


Manager NEM Real Time Operations

X